The ECNEC approved a summary regarding construction of additional 02-lanes and widening/rehabilitation of existing 02-lane carriageway of Shikarpur-Rajanpur section of Indus Highway N-55 to be executed by the National Highway Authority (NHA).
The project would be sponsored by the Ministry of Communications and ADB with the total cost of Rs.44,703.890 million including Rs.4470.390 (GOP share) and Rs.40,233.50 (ADB share).
Similarly, another summary was placed before the ECNEC regarding construction of 69 km long (04-lane) Sambrial-Kharian Motorway.
It would be a high-speed toll road facility which would start from Sambrial city and end point would be Lahore- Sialkot Motorway. The motorway would be constructed on BOT basis at the total cost of Rs.43,382.552 million.
The project would be sponsored by the Ministry of Communications and executed by the National Highways Authority (NHA).