What's new

Pakistani Roads, Motorways and Highways

Imran Khan-led govt approves land acquisition cost for Kuchlak-Zhob road

The government approved on Thursday the land acquisition cost for the Kuchlak-Zhob road section of N-50 (305 km) and decided that expenses would be met from savings in the Public Sector Development Programme (PSDP) and no new allocation would be required.

The go-ahead was given in a meeting of the Executive Committee of National Economic Council (Ecnec), chaired by Finance Minister Asad Umar.

During the meeting, projects related to communications and power sectors were approved. The Planning Division gave a presentation on doubling tracks of western alignment – Kuchlak-Zhob section of N-50 – of the China-Pakistan Economic Corridor (CPEC).
 
.
Abbottabad, Naran proposed interchanges at Hazara Motorway To Boost Tourism

Commissioner Hazara Syed Zaheer ul islam on Friday directed concerned authorities to prepare PC-I for the 1.5 kilometers interchange which would link Hazara motorway from Thanda Choha Salhad to Abbottabad Bus terminal within one week.

It would link main bus stand to Naran with Hazara motorway a six-kilometer-long interchange and the area through Baidadi, Jalkhad road via Bakrial city and from Dabgran to Baidra chowk 3 kilometer long interchange to link Mansehra city.


59812695_2005556536238701_4240660084536901632_n.jpg
 
. .
Sialkot Interchange under construction at Sialkot Wazirabad Road. 91 Km Sialkot Lahore Motorway M-11 under construction by Build-operate- Transfer (BOT) by FWO .It will be operational for traffic in Aug 2019.


60237452_2007858059341882_2565239234092859392_n.jpg



60306934_2007858099341878_3240748400462790656_n.jpg




59983836_2007858172675204_4623820890176487424_n.jpg
 
.
A runaway truck lane. For trucks who's brakes have failed. The gravel on this lane is deep, enough to slightly sink the tires into it, which prevents the trucks from going forward or back. It's usually made on sharper turns.

There are several on M2 South Drive at Salt Ranges descent...




Emergency Ramps on Motorway M2 Salt Ranges South Side
 
.
Kalam-Bahrain road long delayed and ignored project by previous Federal Govt, is now nearing completion. The completion of Swat Motorway after Eid followed by Kalam-Bahrain road will lead to an enormous flow of tourists to this beautiful part of Pakistan..

60182171_2014047165389638_7606824867232481280_n.jpg




60577415_2014047255389629_4632235834915946496_n.jpg



60333337_2014047422056279_4054667711194595328_n.jpg




60554389_2014047335389621_1868245584746381312_n.jpg
 
. . . . .
On the Road to Swat Valley - Mankial Peak catches the last light on May 27 2019

61873975_2594700390575429_7263026629406883840_n.jpg
 
. . . . .
Back
Top Bottom