All Azmat Class orders complete?
Yes.
This is the 2nd Azmat Block-II FAC-M (with Harbah SSMs). More indigenization has been achieved.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
All Azmat Class orders complete?
yes ....
time line was bit longer than expected .. nevertheless good news
View attachment 591716
First indigenously produced ?
So the previous 3 were not indigenously produced at ksew I though all were built at ksew ?
Not sure what it means ? May be last 3 were kit assembly ?
This one produced from raw material onwards ?
I was expecting first indegoiusly designed and produced ?
Compare to previous version ??
View attachment 591717
This is first and second boat design ? How much changed ?
As per initial order yes because four were ordered .All Azmat Class orders complete?
Brother you are talking about MPVs (total 6) 600 tons n 1500 tons and these are FACs( M) 560 tons total 4 .Total Six fast crafts were ordered
4 were in category of 600 Tons
2 were in category of 1500 tons
All six delivered, I think so
Correct me if I am mistaken
Name of this 4th fac
Name of this 4th fac
there are quite a few difference in the design specially the front section.i can notice minimum 6-7 major design changes comparing to base line azmat class
These FAC's carry a huge punch despite their small size which makes them hard to to detect , We should build at least 2-4 more of them .
Seems like PN has purchased propriety design rights of these FACs as in case of Milgem Corvettes. If so, then definitely PN will go for more after this one. @Rashid Mahmood, @Bilal Khan 777 Is there any plan to upgrade first 3 ships? Is Pakistani produced naval grade steel used in this project? What is the percentage of localization in this project? Any details in this regard?
Yes. Its even look just a bit bigger in size.4th FAC
there are quite a few difference in the design specially the front section.i can notice minimum 6-7 major design changes comparing to base line azmat class
They had a requirement for 4-6 more FACs in 2016. It will be interesting to see how they approach that program; perhaps task the Naval Research and Development Institute (NRDI) to work on a next-gen design that's stealthier and faster than this one (see STM FAC-55)?PN modernization is truly remarkable. The pace of induction was unthinkable even 5 years ago.