Imran Khan
PDF VETERAN
- Joined
- Oct 18, 2007
- Messages
- 68,815
- Reaction score
- 5
- Country
- Location
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Don't know the exacts but she is related to defence productions and procurements.who was the lady addressing this ceremony?
Don't know the exacts but she is related to defence productions and procurements.
The keel lying ceremony of this forth FAC(M) which was held in March 30, 2017 (click here) and today it is launched which mean it took around 32 months for making 560 tonnes vessel; this is not somewhat satisfactory but OK, now it will go for sea trials which may take another 6 months if everything goes accordingly otherwise more time will be consumed this mean as of now its take almost 3-3.5 years for us to make a small FAC(M) in-house and to operationally induct in PN
A very humble beginning, a very small first step, but we must improve it further and need to give more orders to Karachi Shipyard and Engineering Works at least of the same class to make them more Proficient in ship building ad designing at least 2 more ships of the same class or something based on this is required to buildup our shipbuilding capabilities .....
Any details on configuration?
who was the lady addressing this ceremony?