It seems they're starting production ~6 months apart of one another.why construction period increasing progressively with each ship?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
It seems they're starting production ~6 months apart of one another.why construction period increasing progressively with each ship?
Yup -- below is from the main contractor ASFAT A.S.
It was decided that 4 MİLGEM corvettes will be purchased by Pakistan, 2 of them will be built in the Istanbul Shipyard and the others will be built in Karachi.
In the first phase, a corvette each respectively to be built in Istanbul and Karachi will participate in the Pakistan Navy inventory in 2023. The other 2 ships will enter the inventory in 2024.
The production process will take 54 months for the first ship, 60 months for the second ship, 66 months on the third ship and 72 months on the last ship.
http://www.asfat.com.tr/en/pakistana-4-milgem-korvetinin-satisinda-imzalar-atildi/
Yup -- below is from the main contractor ASFAT A.S.
It was decided that 4 MİLGEM corvettes will be purchased by Pakistan, 2 of them will be built in the Istanbul Shipyard and the others will be built in Karachi.
In the first phase, a corvette each respectively to be built in Istanbul and Karachi will participate in the Pakistan Navy inventory in 2023. The other 2 ships will enter the inventory in 2024.
The production process will take 54 months for the first ship, 60 months for the second ship, 66 months on the third ship and 72 months on the last ship.
http://www.asfat.com.tr/en/pakistana-4-milgem-korvetinin-satisinda-imzalar-atildi/
i have a feeling that meligim ships for pakistan will not be standard ada class.
Yup -- below is from the main contractor ASFAT A.S.
It was decided that 4 MİLGEM corvettes will be purchased by Pakistan, 2 of them will be built in the Istanbul Shipyard and the others will be built in Karachi.
In the first phase, a corvette each respectively to be built in Istanbul and Karachi will participate in the Pakistan Navy inventory in 2023. The other 2 ships will enter the inventory in 2024.
The production process will take 54 months for the first ship, 60 months for the second ship, 66 months on the third ship and 72 months on the last ship.
http://www.asfat.com.tr/en/pakistana-4-milgem-korvetinin-satisinda-imzalar-atildi/
Sir as per data on net the HQ 16 b range of 70 km+ is optimized to tackle the supersonic missiles like Brahmos so PN should go for it to arm the future ships , meanwhile if possible F22P frigates should also be upgraded with HQ16B as so far it is perhaps the most viable option for PN considering costs and complexities as the other option can be SA Umkhonto but perhaps out of favor from PN for time being.I agree -- my earlier statement was harsh. It was an outcome of our options at that time, but the PN really will go through a massive AAW jump via the Type 054A/P (32 VLS w/HQ-16) and MILGEM (16 VLS w/HQ-16).
may be 2 more in future . Pakistan Navy standard number is 4 usually hehe .thats bad. should go for atleast 4. this ship looks good. looks equal to milgem class.
In Sha ALLAH .I agree -- my earlier statement was harsh. It was an outcome of our options at that time, but the PN really will go through a massive AAW jump via the Type 054A/P (32 VLS w/HQ-16) and MILGEM (16 VLS w/HQ-16).
Ma Sha ALLAH .great design looks more than 2,300 tons
very nice
Brother any chance of Harbah missile ???It is a barebone ship , a empty shell platform
Pakistan will pick unique customization for it by Local effort
> The most immediate offensive weapon would be our Anza Missile fired from a Sailor
> The Cannon which comes with ship
> CWIZ
> Helicopters would be able to launch Torpedo and Hunt submarine
Work in progress for our Engineering group to make it customize it
2 are expected in 2023 n 2 in 2024 according to Turkish brother websites .Are you sure that all 4 would be delivered by mid 2020?
Excellent news..... but also a bit sad. A country of 220 million with some very highly talented people has to look towards a tiny country like Romania for building our war ship. Thanks to seven decades of zero emphasis on indigenous manufacturing and production.
The OPVs dont seem to be capable of carrying missiles,so How to deal with enemyThe OPVs dont seem to be capable of carrying missiles so will probably be chosen to do patrol duties more economically whilst freeing our more capable platforms for less wear and tear.
These OPVs also have UAV capability. Lets see if they are local or imported.
Since PN upgraded order to 2300ton the pictures/videos match the OPV2400.
OPV Damen 2400
https://products.damen.com/-/media/.../Documents/Offshore_Patrol_Vessel_2400_DS.pdf
0how many exactly ships are under construction in KSY ?