Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I wonder what the plan going forward with the F-22Ps. I feel these ships which are still relatively new with the oldest being only 12 years old. I know that these have kind of fallen out of the discussion a bit with the Baburs and Tughrails coming on line, but this is a reasonably large surface platform which could be put through an MLU and with the correct systems, could be made effective. Given its size being similar to Baburs, and the presence of the deck on which FM-90 sits, it is clear a VLS should be able to fit. In fact, the 051B (granted its much larger) underwent a similar refit/mlu in 2015. The deck and FM-90 were replaced with a 32 cell VLS for HQ-16. IF were marry the Naresuan style MLU and the 051B, you could replace the FM90 and its deck with a VLS (ideally using similar sensors to the Babur). Installing Genesis Advent CMS, Smart S Mk2 or SR2410c and Albatross NG system or Hq-16 (possibly 12-16 cells) would dramatically improve this ships utility.
CNS flag/SO is my class fellow.....View attachment 793004
Chief of the Naval Staff Admiral Muhammad Amjad Khan Niazi is on official visit to Kuwait.
View attachment 793005
View attachment 793006
View attachment 793007