No mate you are still out of picture, you are talking as if the JFT programme has been curtailed and production terminated.
Look a little closer to home, while the LCA hasn't been even inducted, there's a talk of LCA Mk-2.
While around 50 JFT have already been produced with majority of them operational in squadron service, the Mk-2 is already in the pipeline and there's even rumours of beyond. If funds were so scarce, additional AWACS would be the last option, on another note, Pakistan working on it's own war doctorine, has also been investing in conventional missile for stand off capability to off set the Indian numerical advantage. !!
I am out of picture
1) Is LCA even needed to fight JFT when MKIs are already available in superior numbers? (Although I won't complain if you say JFT is not worth fighting MKI
)
2) Are you even trying to understand the situation? Just the other day, PAF had abandoned it's plans to modernize/re-equip the air force by 2025 due to lack of funds. Do you know what
this means? Isn't it completely OBVIOUS that many of PAF's previously sorted plans are in ruin?
It does not matter if JFT is block-1 or 2, it was anticipated when the economic situation was better than now, and still, every plane can be modified/scrapped as time demands it. But however
none of this changes the fact that the planned number of JFTs in only reducing, not increasing!
It was 275-300 once, then became 250, then cut further to 150 now. Who knows it may be slashed to just 100 or less in future? I don't see any betterment on that front, sorry!
And btw, look at the IAF - our acquisition plans are only increasing, unlike yours.
1) Originally there were 140 MKIs to be bought, now the number is 270+.
2) Originally the competeion was for 126 jets, now there is strong negotiation going on to add another 63 to the order.
AND note: the increase in orders is not only true for jets fighters but also helicopters, transports, AWACS, refuellers etc. etc. which are just as vitally important to a nation's war effort as much as fighters.
There's no changing the fact that we can (and will/are) afford much better, much more, than you.
And please don't even try to obtain parity, because in this hopeless game of catch-up, you
will nicely deplete whatever little financial resources you have available.
No mate you are still out of picture, you are talking as if the JFT programme has been curtailed and production terminated.
Look a little closer to home, while the LCA hasn't been even inducted, there's a talk of LCA Mk-2.
While around 50 JFT have already been produced with majority of them operational in squadron service, the Mk-2 is already in the pipeline and there's even rumours of beyond. If funds were so scarce, additional AWACS would be the last option, on another note, Pakistan working on it's own war doctorine, has also been investing in conventional missile for stand off capability to off set the Indian numerical advantage. !!
And I almost forgot...why do you keep bringing up the Block-2 of JFT?
Are you unaware of the fact that even our MKIs are due to undergo upgrade to Super-Sukhoi which
will have technologies originally developed for the PAK-FA?