What will you do google that in news? lol
We might need 300 for our need and another 100 for navy or 100 for UN missions and for exhinition flying etc
Well nothing to do with imagination , when we made AlKhalid tank we never put a limit on it
So why will be putting a limit on things
And similarly we need to replace our inventory & also account for new planes in neighbouring country that will increase security risks so 300 planes while is great but we can go more
We don't have a fixed limit on our ambitions
And we also have to account for customers as well - so our productions will have to be naturally increased
300 is a good start , but we can also manufacture 70-80 for our navy usage or station 36 planes in frindly countries
Do you really think in current situation , Pakistan can afford such high no of JF-17 AC??
300 For PAF
100 For Navy ??
100 For UN Missions ????
Station 36 fighters in friendly countries is not even feasible in next 20 yrs by looking at current scenario.
Pls donot be so over confident on no. of AC, lets wait and watch how induction goes for JF-17.
As long as Block II,III are concerned there are not as such package details posted anywhere. If yes pls share the link.
For Avoinics its still search is going on. Some guys says it will be chineese , some says Pakistan developed its own. Pls paste some link with reliable resource, what avoincs pakistan industries has developed so far and what is their progress in integration on this AC.
For engine also we need to see how much WS-13 gona time to integrate and certified for production. Almost 150 Russian engines are already been received, i think. But seeing at requirements not sure 150 will be used by Pakistan for JF-17.
It will be a hype if all over react on what this AC will be able to do, when this upgrade happen, when this engine change happen, when these avoinics will be integrated or when these nos per year will be produced. There are so many "when this happen" are there. So lets wait and watch how everything comes up.