Hey
@Bilal Khan (Quwa) do you remember our conversations
16 years ago on PDF regarding the purchase of the 214 submarine?
Well now it looks like it is coming to Pakistan in the form of the REIS class i.e. the licence build from Turkey, which the Mildem will be based off, with improvements! So I guess our vision is coming to light.
The infrastructure established for REİS Class Submarines will be used in the design and construction of the first national submarine, MİLDEN, which will be designed and built with a high domestic contribution rate and national resources. Although initially thought to have similar dimensions and displacement as the REİS Class,
I believe that MİLDEN boats will be slightly longer and heavier than planned. MİLDEN Submarines will have a length of around 75-80m, a beam of 7m, a draught of 6.5m, and a submerged displacement between 2,500-3,000 tons and unlike the REİS Class, MİLDEN Submarines will have at least one Reformer. Preferred for long-range missions, Reformer is preferred for large (over 2,000 tons) submarines. Both PEM Fuel Cell modules and
Reformers to be used in MİLDEN submarines to be equipped with 300kW (400hp) AIP System will be designed and produced nationally, and the systems will also be developed domestically under the Submarine Propulsion System Components Development Project. The PEM Fuel Cell modules, which will be manufactured locally by the company to be selected under the project, are intended to replace the BZM120 modules currently used in REİS Class Submarines in the following years. A
dditionally, unlike the REİS Class, MİLDEN Class is expected to use locally produced Lithium-Ion (Li-Ion) batteries (LIB) with higher power and capacity instead of lead-acid batteries. Unlike REİS Class submarines, which are currently under construction, and AY, PREVEZE, and GÜR Class submarines, which have a single compartment cigar-shaped hull form, MİLDEN class submarines will have a multi-compartment teardrop hull form. I think that MİLDEN will have at least six 533mm heavyweight torpedo tubes and one 650mm deployment station to allow SAS/SAT underwater operations.
Mr Ibrahim Sünnetçi