Great Janjua
SENIOR MEMBER
- Joined
- Aug 13, 2016
- Messages
- 3,733
- Reaction score
- -3
- Country
- Location
Hope we get some good news regarding our attack helicopter procurement very soon. It is more than overdue at this point.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Maybe Chinese are still working on the things PA wants them to be improved? those things can take time right?Concerning the fact that the J-10CE has been unveiled and delivered ... any news concerning the Pakistan Army Z-10ME deal?
This lady has some good track record of breaking defence news.Credibility?
That essentially means 40-50 helicopters. We are still interested in Atak II, what role would it play then?Just a refresher, but the PAA's attack helicopter requirements are 2-fold:
1. a durable platform for anti-armor ops in our desert environments
2. a lighter platform for high-altitude ops
Back in 2015, the PAA chose the AH-1Z and T129 for requirements #1 and #2, respectively. In looking at the Z-10ME's main optimizations, it seems that it would go for requirement #1.
The interesting thing however is whether the PAA will fold requirement 2 into the Z-10ME too. In other words, use one helicopter type instead of two.
I suspect it'd be for the high-altitude requirement (albeit as a heavier platform than the originally sought T129).That essentially means 40-50 helicopters. We are still interested in Atak II, what role would it play then?
Concerning the fact that the J-10CE has been unveiled and delivered ... any news concerning the Pakistan Army Z-10ME deal?
But we have very good experience with European as well as American helicopters.Western suppliers are not reliable during a conflict. Pakistan will stick with MENA, China or local production for defense needs going forward.
Reason is Chinese soft and long term loans and subsidised costBut we have very good experience with European as well as American helicopters.
Ham ne kal nahi dekha aur aap karte hai baat end of 2022 ki.2022 end or 2023. More chances r for 2023.
But not when supply and spares cannot be easily secure and guarantee. World is keep evolving, Pakistan need to adapt to changing environment and cannot keep living in past or so called track record.But we have very good experience with European as well as American helicopters.
Engine is upgraded, I guess.,.,.,.
https://twitter.com/ForumStrategic
@ForumStrategic
Update on Z-10ME For the first time a Z-10 was seen carrying a mast-mounted radar as shown on this updated Z-10ME. Visible upgraded features are as follows
~ MAWS.
~ Upgraded IFF.
~ DIRCM.
View attachment 828545
,.,.,.,,.,.
Z-10M already had an engine upgrade over Z-10K and Z-10ME already had a further engine upgrade over Z-10M, so they might not have needed to change the engines again.Engine is upgraded, I guess.
Very well, Z-10 Longbow
Powerplant:
AH-64A
2 × General Electric T700-GE-701 turboshaft engines, 1,690 shp (1,260 kW) each
AH-64D
upgraded to 1,890 shp (1,409 kW) T700-GE-701C
AH-64D engine increased 11.8% power for longbow.
The war in Ukraine has shown the the assets seizure of wealthy Russians by the west is nothing but piracy. They all gang up together and this is worrying for countries like PakistanWestern suppliers are not reliable during a conflict. Pakistan will stick with MENA, China or local production for defense needs going forward.