What's new

Pakistan F-16 Discussions 2

Amazing USAF F-16 Videos :flame: :flame: :flame:. Stunning Dog fighting maneuvers , Live weapon release and gun firing , Night time flying and NVG, Low level flyings plus pilots and crew having fun :tup: :tup: :tup:

Fighter Pilot - The Memoirs of a Legendary F-16 B-Course Class


13-ABK Gunfighters F-16 B-Course Graduation


13-EBG F-16 B Course Graduation Video



P.S. Youtube videos.

@gambit @Oscar @Munir @Windjammer @Fulcrum15
 
Last edited:
.
Amazing USAF F-16 Videos :flame: :flame: :flame:. Stunning Dog fighting maneuvers , Live weapon release and gun firing , Night time flying and NVG, Low level flyings plus pilots and crew having fun :tup: :tup: :tup:

Fighter Pilot - The Memoirs of a Legendary F-16 B-Course Class


13-ABK Gunfighters F-16 B-Course Graduation


13-EBG F-16 B Course Graduation Video



P.S. Youtube videos.

@gambit @Oscar @Munir @Windjammer @Fulcrum15

The Red Flag ones were pretty impressive too. I wonder if PAF would ever release such footage.
 
. .
The HUD footage from Pak/Saudi exercise did end up on e-bay and was snapped by a very keen collector in US for a four figure sum.

You mean the one where F-16s were up against the RSAF f-15s and Typhoons?

Lol, why was it on ebay?
 
. .
block 52 in 52c temperature
10376095_1498066383757452_606053922079845909_n.jpg
 
. . .
Some time ago someone asked about the order of sniper pods... Here it is...

Sniper Advanced Targeting Pod (ATP) System, Replenishment Line Replaceable Unit Spares, Bench Stock, Support Equipment, Technical Orders, Contractor Technical Support (CTS) and User Familiarization



This market survey is being conducted to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements for manufacturing, testing and delivering AN/AAQ-33 Sniper Advanced Targeting Pod (ATP) Systems, Replenishment Line Replaceable Unit (LRU) Spares, Bench Stock, Support Equipment, Technical Orders, Contractor Technical Support (CTS) and User Familiarization for the Sniper ATP system. The level of security clearance and amount of foreign participation in this requirement has been outlined in the Advanced Targeting Pod (ATP) Programs, AN/AAQ-28, Laser Infrared Targeting and Navigating (LITENING), AN/AAQ-33 Sniper Advanced Targeting Pod – Sensor Enhancement (ATP-SE) Security Classification Declassification Guide (SCDG), 1 July 2010. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.


INSTRUCTIONS:


  1. Below is a document containing a description of the sustainment requirement and a Contractor Capability Survey, which allows you to provide your company’s capability.

  1. If, after reviewing these documents, you desire to participate in the market research, you should provide documentation that supports your company’s capability in meeting these requirements. Failure to provide documentation may result in the government being unable to adequately assess your capabilities. If you lack sufficient experience in a particular area, please provide details explaining how you would overcome the lack of experience/capabilities in order to perform that portion of the requirement (i.e., teaming, subcontracting, etc.)

  1. Both large and small businesses are encouraged to participate in this Market Research. Joint ventures or teaming arrangements are encouraged.

4. Questions relative to this market survey should be addressed to Candace Gibson, (478) 926-1384.


REQUIREMENTS DESCRIPTION
AN/AAQ-33Sniper Advanced Targeting Pod (ATP) Systems, Replenishment Line Replaceable Unit (LRU) Spares, Bench Stock, Support Equipment, Technical Orders, Contractor Technical Support (CTS) and User Familiarization for the Sniper ATP

PURPOSE/DESCRIPTION

We are conducting market research to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements for manufacture, test, and delivery of Sniper ATP Systems, Replenishment LRU Spares, Bench Stock, Support Equipment, Technical Orders, CTS and User Familiarization for the Sniper ATP systems sold to Foreign Military Air Forces to include Iraq, Pakistan and Taiwan through Foreign Military Sales. This acquisition of supplies and services is for five years through CY2020. This requirement is to sustain 125 operational systems flying an average of 12 hours per month at an 85% operational availability.
 
.
The main factor was Rafael and typhoon came top in six months of evaluation from hundreds of factors.

You do know that Rafael was rejected and kicked out of the competition? And then reinstated as a competitor after some French "persuasion"?

a senior defence ministry official made it clear on Thursday that Rafael has been rejected at the technical evaluation stage for failing to meet minimum performance requirements that had been detailed in the tender document.
French Rafale out of race for IAF fighters - Indian Express

Ouch.....


On topic:

Anyone know if the Jordanian birds have started stretching their wings over their new home?
 
Last edited:
. .
You do know that Rafael was rejected and kicked out of the competition? And then reinstated as a competitor after some French "persuasion"?


French Rafale out of race for IAF fighters - Indian Express

Ouch.....


On topic:

Anyone know if the Jordanian birds have started stretching their wings over their new home?

Hi,

Kicking out rafale initially, was a strategic ploy by india---they took the air out of the sails of france---. The french were being setup for what the indians would be demanding later---. To push the deal forward---one of the participants supposedly suggested of cancelling the radar & other weapons systems for JF 17 for the deal on rafale to re-start.

after pak decided to go against the rafale---india was pre determined to go for that aircraft right from gitgo. That was the most superior aircraft that pak could have gotten with least restrictions.

Secondly---this aircraft had been in service for awhile---so basically most of the bugs had been taken out & all systems working above par.

Paf will pay heavily for their error.
 
.
Hi,

Kicking out rafale initially, was a strategic ploy by india---they took the air out of the sails of france---. The french were being setup for what the indians would be demanding later---. To push the deal forward---one of the participants supposedly suggested of cancelling the radar & other weapons systems for JF 17 for the deal on rafale to re-start.

after pak decided to go against the rafale---india was pre determined to go for that aircraft right from gitgo. That was the most superior aircraft that pak could have gotten with least restrictions.

Secondly---this aircraft had been in service for awhile---so basically most of the bugs had been taken out & all systems working above par.

Paf will pay heavily for their error.

I agree that Rafale was best option back then but it does costs them not that much to get very near that plane... ;) Can't say more but we do have tested everything on the Rafale. Every single part. There is not much we do not know. And I can say it does cost a lot less... The French are money suckers second to none. We paid for that for the old Mirages we have...
 
. .
@Windjammer What is the cost of per sortie , F16 and JF17. ( cover maintenance,crew ,ammo,gas etc etc)
I think there is a post on the forum about this. The costs are if I remember correctly $6000 for the 16s and 2000 for JFT.
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom