soaringphnx
FULL MEMBER
- Joined
- Jun 22, 2010
- Messages
- 418
- Reaction score
- 0
Thats if it ever Ends up happening, Right now its all a dream
You are wrong here mate. The LCA is currently indergoing testing and has passed every test thrown at it including LEH trials. If all goes well, it would get operational clearance by possibly December and we can expect induction in early 2011. LCA Mk2 can be expected by 2013-2014.
Maybe you should do a little more homework before posting something.