What's new

Pak-Saudi joint steel venture: Al-Tuwairqi records highest-ever production

Cyberian

BANNED
Joined
Mar 5, 2013
Messages
4,158
Reaction score
-13
Al-Tuwairqi records highest-ever production
Friday, May 24, 2013

20130524_business1.jpg


KARACHI: Tuwairqi Steel Mills Limited (TSML), Pakistan’s first private sector integrated environment-friendly steel manufacturing complex and a joint venture of Al-Tuwairqi Holding (ATH)/ISPC of the Kingdom of Saudi Arabia and the world’s third largest steel maker POSCO has recorded the ever highest production of an iron making plant in Pakistan during the Plant Demonstration Test (PDT) conducted in the expert supervision of MIDREX, USA.

During the PDT, the plant ran at 100 percent of its rated capacity i.e producing 160 tonnes of high quality Direct Reduced Iron (DRI) per hour for 72 hours achieving all of its operational targets.

This development comes at a crucial juncture when Pakistan’s current per capita steel consumption is only 40 kilogram, which is exuberantly low, when compared with the global average of 215 kilogram. This establishes a dire need and increased emphasis on achieving international benchmarks to become a modern and an efficient economy.

Dr Asif Brohi President National Bank of Pakistan congratulated the entire team of Tuwairqi Steel Mills on achieving this milestone and appreciated their enthusiasm and technical expertise.

It is heartening to observe TSML has already increased the production capacity of Pakistan by 1.28 million tonnes per annum, which would help meet the ever growing demands of steel in Pakistan and with its massive expansion and modernization plans, Al-Tuwairqi is poised to transform the country into an industrial hub, he added.

Zaigham Adil Rizvi Director (Projects) TSML said, “We are committed to our vision to participate in the development of national economy in order to have a long sustaining growth of Pakistan.”

During the PDT, Chang Hee Lee Council General of South Korea, Rahat Kamal DMD SSGC, Major General Javed (r) Chairman Pakistan Steel Mills; Zubair Motiwalla Chairman Sindh Board of Investment, Waqar Ahmed Hashmi DMD KW&SB and Ghulam Rasool Shiekh from EPZA were also present.

Al-Tuwairqi kicked off the commercial production of TSML’s 1st phase in January this year-a Direct Reduction of Iron (DRI) making plant with the capacity to produce up to 1.28 million tonnes per annum of high quality DRI, which is evidently steel’s most versatile metallic and a preferred raw material for quality steel making worldwide. staff report

Daily Times - Leading News Resource of Pakistan
 
Highest-ever steel production in country celebrated
Tuesday, June 11, 2013

LAHORE: Pakistan’s first modern environment-friendly and largest private sector steel manufacturing project worth $350 million under Tuwairiqi Steel Mills (TSML) celebrated the highest ever production of iron making in Pakistan.

The experts from various countries including the United States elaborated the qualities of the project. Giving details of the project Director (project) and country head TSML

Zaigham Adil Rizvi said iron making at its highest capacity had been made under Plant Demonstration Test (PDT) conducted under the supervision of the MIDREX experts which was the unique group of its nature in the world in Direct Reduced Iron ( DRI) technology.

He said the plant produced clean and pure iron under less smoked and noiseless friendly environment, as it emitted one third of carbon pollution as compared to the other iron manufacturing methods, adding it was the first ever DRI plant in the country which was producing better quality DRI than it was being produced in Saudi Arabia and it met the international standards in quality. staff report

Daily Times - Leading News Resource of Pakistan
 
Highest-ever steel production in country celebrated
Tuesday, June 11, 2013

LAHORE: Pakistan’s first modern environment-friendly and largest private sector steel manufacturing project worth $350 million under Tuwairiqi Steel Mills (TSML) celebrated the highest ever production of iron making in Pakistan.

The experts from various countries including the United States elaborated the qualities of the project. Giving details of the project Director (project) and country head TSML

Zaigham Adil Rizvi said iron making at its highest capacity had been made under Plant Demonstration Test (PDT) conducted under the supervision of the MIDREX experts which was the unique group of its nature in the world in Direct Reduced Iron ( DRI) technology.

He said the plant produced clean and pure iron under less smoked and noiseless friendly environment, as it emitted one third of carbon pollution as compared to the other iron manufacturing methods, adding it was the first ever DRI plant in the country which was producing better quality DRI than it was being produced in Saudi Arabia and it met the international standards in quality. staff report

Daily Times - Leading News Resource of Pakistan


Why doesw this plant produce at 100% capacity and yet the giant Pak Steel Mills cannot manage even 60% production capacity - one is privately owned, the other is a govt owned -- Can you guess which is driven by corruption and inefficiency and which generates profits?? -- Whats the lesson in this??
 
Why doesw this plant produce at 100% capacity and yet the giant Pak Steel Mills cannot manage even 60% production capacity - one is privately owned, the other is a govt owned -- Can you guess which is driven by corruption and inefficiency and which generates profits?? -- Whats the lesson in this??

sir ji privatization comes to my mind
 
sir ji privatization comes to my mind


After years of "Islamic Socialism", most Pakistanis seem to have forgotten that this radical modern idea is an effort to negate the lesson of 5000 years of history -- Perhaps the the prophet of Islam was a socialist?? Or was he a private property owning businessman???
 

Pakistan Defence Latest Posts

Back
Top Bottom