Rafi
ELITE MEMBER
- Joined
- Jul 23, 2010
- Messages
- 11,752
- Reaction score
- 13
- Country
- Location
After successful launching and operation of BADR series of experimental satellites (BADR-1 and BADR-B) in the 1990s and early 2000s, SUPARCO now plans to launch high resolution remote sensing satellite system (RSSS) to meet the national and international user requirements in the field of satellite imagery.
A feasibility and system definition study was concluded in January 2007 which recommended the launch of a constellation of Optical and Synthetic Aperture Radar (SAR) Satellites to ensure that the domestic and international user requirements are competitively met. In this respect the RFP for RSSS consultancy services was launched in July 2007. Launch of RFP for the manufacturing of the satellite is planned in the third quarter of year 2008.
RSSS is planned to be a progressive and sustainable program. Initially, SUPARCO plans to launch an optical satellite with payload of 2.5 meter PAN in 700 km sun-synchronous orbit by the end of year 2011, which will be followed by a series of optical and SAR satellites in future. Necessary infrastructure for ground control and image reception and processing is also planned to be setup.
A feasibility and system definition study was concluded in January 2007 which recommended the launch of a constellation of Optical and Synthetic Aperture Radar (SAR) Satellites to ensure that the domestic and international user requirements are competitively met. In this respect the RFP for RSSS consultancy services was launched in July 2007. Launch of RFP for the manufacturing of the satellite is planned in the third quarter of year 2008.
RSSS is planned to be a progressive and sustainable program. Initially, SUPARCO plans to launch an optical satellite with payload of 2.5 meter PAN in 700 km sun-synchronous orbit by the end of year 2011, which will be followed by a series of optical and SAR satellites in future. Necessary infrastructure for ground control and image reception and processing is also planned to be setup.