Falcon26
SENIOR MEMBER
- Joined
- Dec 24, 2015
- Messages
- 2,753
- Reaction score
- 3
- Country
- Location
K-8 assembly line in Pakistan has shut down since all resources diverted for JF-17 manufacture. PAF was evaluating LIFT aircraft when JF-17B was not intended but since there was a need from some prospective clients it was eventually developed and the JF-17B can meet the lift role for PAF, no need for another platform. China will prefer marketing JL-9 because of F-7 commonality and aircraft carrier training capability whereas JL-15 is good for training of future generation aircraft pilots.
Isn’t this an opportunity to bring in the private sector and divert manufacturing of K-8 to them while PAC concentrated on JF-17 & Project AZM? @Bilal Khan (Quwa)