TOPGUN
PDF THINK TANK: ANALYST
- Joined
- Jun 6, 2006
- Messages
- 8,689
- Reaction score
- 2
- Country
- Location
still need 130 more man . not enough at all .
Good things come to those who wait !!
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
still need 130 more man . not enough at all .
IAF waiting for tejas since last 30 yearsGood things come to those who wait !!
IAF waiting for tejas since last 30 years
dont u think we have been waiting too long i remember last year during december PAC announced the production of 16th JFT that year bringing the total number produced to 66 in january 2016 and they claimed they were planning to expand the production per year to 24 so going by their previous press release they only produced 4 JFTs this yearGood things come to those who wait !!
I believe some may be at final stages on assembly line, few under tests and may be some have been upgraded from block 1 to 2 standard during this period.dont u think we have been waiting too long i remember last year during december PAC announced the production of 16th JFT that year bringing the total number produced to 66 in january 2016 and they claimed they were planning to expand the production per year to 24 so going by their previous press release they only produced 4 JFTs this year
http://nation.com.pk/national/29-De...al-production-target-of-indigenously-produced
dont u think we have been waiting too long i remember last year during december PAC announced the production of 16th JFT that year bringing the total number produced to 66 in january 2016 and they claimed they were planning to expand the production per year to 24 so going by their previous press release they only produced 4 JFTs this year
http://nation.com.pk/national/29-Dec-2015/jf-17s-fly-high-in-pak-skies-pakistan-meets-annual-production-target-of-indigenously-produced
we need too many more for cover our need i am not worry abut export i wanna see minimum 120 active thunders in PAF first
most probablyI believe some may be at final stages on assembly line, few under tests
upgradation of old blocks wont happen until the required number of operational jets arent producedupgraded from block 1 to 2 standard
We have to deal with what we can ... PAC has come a long way rather then bashing it we must embrace it they and PAF know what they are doing simply.
But 2p29 is also ready then we must have at least 78 thunders...why only 70? does that include the CCS squadron?
Lolz well thank GOD we are not IAF sucks for them.