What's new

Over 40pc Pak textile units relocate to Bangladesh

For rain, flood and natural calamities in CHT...no govt. credit is there :bad: .

Besides, the uninterrupted power supply deal of 15tk/unit gave govt enough option to operate quick rental plant which were sitting idle for the first part of this year due to fund crisis and subsidy. The days for prolonged load shedding are over.
 
.
Besides, the uninterrupted power supply deal of 15tk/unit gave govt enough option to operate quick rental plant which were sitting idle for the first part of this year due to fund crisis and subsidy. The days for prolonged load shedding are over.

Let's see, I don't believe bal a bit....my bad :cry: .
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom