1- This road to nowhere added 7000MW to national grid Only electricity gap was causing 13 billion dollars loss to Pak economy per annum.
2- Access to electricity for the rural population increased from 90.3% in 2015 to 98.8% in 2016 (World Bank)
3- Transmission and Distribution Losses went down to 16.5% in 2017 from 19% in 2015 (Ministry of Finance)
4- Bill recoveries increased from 16% in 2015 to 19% in 2017 (Ministry of Finance)
5- Installed capacity of electricity is 29,573 MW in 2018, which was 22,812 MW in 2013 (Pakistan Economic Survey)
Electricity generation increased from 96,496 GW/h to 117,326 GW/h (Ministry of Finance)
6- A total of $ 33.8 billion in energy project have added 12,230 Megawatts of energy (Pakistan Economic Survey)
Job Creation
1- Early harvest projects of CPEC have created 30,000 direct jobs for Pakistanis (ACCA Global and PCI)
2- 800,000 direct jobs estimated in the next 15 years. (Ministry of Planning and Development)
3- Construction of ML-1 projects will further create 10,000 to 15,000 direct jobs this year (Ministry of Planning and Development)
4- CPEC will reduce unemployment by 2.32 million by end of 2018 (Global Times)
5- 75% of the total employees working in CPEC projects are Pakistanis, contrary to the belief that the Chinese have a higher representation (Ministry of Planning and Development)
6- Raksai and Faisalabad SEZs are Umder construction, many more ro come. Will strengthen industrial base.