What's new

No money, no aircraft carrier !

Pakistan has enough missiles to keep Indian AC far away from her shores.
For ur kind information AC are supose to be far from enemy shores . Over over even if it take 6 billion $ its good for India on too many front . Atleast now India will have 1 more AC by 2020 with Ins VIKI . Which is really a super boost in Asian continent . We are talking about 60 Aircrafts all together at sea . Which will raically decrease the Enemy's Naval Pnch on indian Navy . Not to forget India will have tri camand at andaman ni cobar island . With morethan 100 Ships under contruction we are in berge of dominationg many Countries in the world Including Pakistan and China . But i really wish if India can buy one more super carrier even if it comes with f18 from USA will better option . This article just stated about difficukties faced by Indians for theirs biggest Ship ever . Even it took many years for russians to modify an already built AC VIKI . Nothing wrong with tat. End of the day Chinese present AC is just a show case and Huge Target at high sea. VIKI and Vikrant is totally in a diffrent league . Indians always wanted to have a better one . Example is Su 30 mki . When we had option of best Su 27 & Su 30 . With Naval LCA MK1 and MK 2 Indian Navy can posses the besy Naval Wing . Not to mention N-Rafale( may be ) and Mi-29 KUB . As we saw recently released russian future AC model .Which had N-Pakfa . Its anothe option in the near future . Even at present navy strengh of India is well equiped than other two forces ARMY and AF . Hope India will keep her focus on Arihant 1 & 2 already under construction . 3rd should had been started by now. It will be kept secret as Arihant 2 . WHich came to light because of an accident . With Arihant expirence India can build conventional subs too . As time taken to construt these subs getting thin and thinner .
Future of Asian waters belongs to India with many patners who got the same intrest . No wonder in future USA will help India to strengthning IN with it Aircraft,Sensors,Missiles etc...

Title was very funny . Is it for Pakistan Navy ?
 
"Cost". The article say India is suffering from the rising cost.

Cost = money.

No money = no aircraft carrier !!!

UNDERSTAND ???

Cost = Money u r right ...If No Money No AC .Yes U r right. But what it has to do with Indian Navy ? When it can spend more money . We even spend many 1000 crs for Sats ,Mars and other Space mission . Explain what No moy No Aircraft has to do with Indian Navy or even this Article . Did any where officials said WE DONT HAVE MONEY SO WE WONT HAVE A/C ?

Don't laugh until your AC is ready to sail !!! LOL
lol You troll before 2018 then
 
what is the purpose of this thread???? Anyone.
Purpose is Just that this Kid Want to Troll . He is very happy that Indian A/C is delayed . More mony spent by India That Too 5 bil $ for A/C . I wonder he thought AC is some 50 $ or something

But India HAS THE MONEY.

So money= aircraft carrier.


BS article.


The IN said in their press conference last week that the ship is 70-80% complete.
Article was correct but this dude changed 70% into 30% ... lol
 
Bangladesh also thinking of building its own carrier. India can wait till rupee stabilized and BD gets its first carrier so that they dont have to run around the globe for technology transfer. We can always help..
 
This dude got off today...so troll drilling all threads.
 
Intellectual Property Theft: Get Real — National Crime Prevention Council

India’s 15,000 illicit fake drug factories are believed to account for 75 percent of the world supply of counterfeit drugs.

6EK1sK7.gif
 
India's First Indigenous Carrier Faces Delays, Cost Growth

India's First Indigenous Carrier Faces Delays, Cost Growth | Defense News | defensenews.com


NEW DELHI — While India claims that its first home-built carrier, the Vikrant, will be fully operational by 2018, Indian Navy sources say that date is closer to 2020 since the ship is only about 30 percent complete.

On Aug. 12, India’s first indigenous aircraft carrier (IAC-1) will be launched nearly four years behind schedule. The ship is being built by state-owned Cochin Shipyard Limited at Kochi in southern India.

The aircraft carrier will be floated out of dry dock, then redocked in order to mount the propulsion system. Work will then begin on the deck and the weapon systems before sea trials. And while Defence Ministry officials say those trials will begin by 2016, Indian Navy sources say it will not be before 2018-19.

“Launch merely means they will float the IAC-1 from the dry dock [to outfit the interior],, which includes laying of pipes, and after that it will be dry docked again for integration of propulsion systems,” an Indian Navy source said

Not only will Vikrant’s induction be delayed, but sources add that the total cost of the carrier will be more than US $5 billion, including the aircraft and weapons systems. When the project was approved in 2003, the ship was estimated to cost around $500 million. Sources said the construction of the carrier, minus the weapon systems and aircraft, will cost more than $2.2 billion.

Indian Navy spokesman Cmdr. P.V. Satish insisted that IAC-1 will be inducted in 2018.

“First and foremost, it needs to be understood that constructing an aircraft carrier is a very complex task. At the time of keel laying of the IAC in 2009, it was estimated that the ship would be delivered by 2014-15,” he said. “However, due to delays in arrival of some machinery from foreign sources, which are essential prior to the launch of the ship, the Phase I launch of the ship has been delayed by around three years. There have been certain other delays also in finalizing the detailed design aspects due to uniqueness of the systems. Things are now in place and we look forward to a targeted delivery by 2018.”

Indian Navy sources countered that at the time of the launch, only the hull and the outer structure will be completed, about 30 percent of the total work needed for the carrier.

After laying piping, the carrier will be redocked to mount the gear box, hydraulic systems, generator systems and propulsion system.

Work will then focus on the hangar deck for aircraft, berthing spaces for 1,400 sailors, boiler room and the flight deck.

Before sea trials, workers will install the Israeli-made Barak air defense system, multi-function radar system, A630 close-in weapon system and combat management system, the sources added.

An Indian Navy official said this ship will be able to stop attacks from enemy aircraft and will have anti-submarine defense systems. All systems on board will be integrated through a combat management system.

The Vikrant will be 262 meters long and be able to accommodate around 30 aircraft, including helicopters.

“IAC-1 features a STOBAR [short take-off but arrested recovery] configuration with a ski-jump. The deck is designed to enable aircraft such as the MiG-29 to operate from the carrier. It will deploy up to 20 fixed-wing aircraft, primarily the Mikoyan MiG-29K and the naval variant of indigenous Tejas Mark 2, besides carrying 10 Kamov Ka-31 helicopters,” the Indian Navy official said.

The Navy plans to have three aircraft carriers; a final decision is awaited on the IAC-2, which would be another homemade carrier but would displace more than 60,000 tons, 20,000 tons more than Vikrant. IAC-2 is still in the design stage but will have a catapult deck.

“IAC-2 is currently on the design board. Various feasibility options for the carrier are presently being pursued. Detailed study on the type and complement of aircraft and the ships’ propulsion options is being progressed to further narrow down design options,” Satish said.

Despite the delays and ballooning cost of IAC-1, defense planners, Indian Navy officials and analysts agree that India must build — not import — its carriers.

“Getting modern carriers in the open market is not easy. Our experience with Vikramaditya [Russian-made Admiral Gorshkov] is evidence,” said Probal Ghosh, senior fellow, Observer Research Foundation, adding that the Navy should now concentrate on IAC-2 and begin construction as soon as possible.

“Personally, I don’t think India should look toward procuring an aircraft carrier from abroad. Indigenous development with foreign collaboration, transfer of technology in certain areas where we may not have the expertise as yet would be far more prudent,” said Anil Jai Singh, retired Indian Navy commodore and vice president of the National Maritime Foundation.

Having three carriers allows one to be stationed on each of India’s coasts, while the third would undergo repairs or perform other duties such as training.

“The Navy has a clearly spelt-out capability plan which factors a balanced growth and includes a plan to have two carrier battle groups,” Satish said. “This will naturally entail having three carriers with requisite support ships to form a battle group. All the components are equally important.”

*COUGH COUGH*


Don't take it from me or this moron who has written this aericle, take it from an Indian Navy ADMIRAL:

"About 83 per cent of the fabrication work and 75 per cent of the construction work will be over when the ship goes into water," said Indian Navy's vice chief, Admiral Robin Dhowan.

While nearly 90 per cent of the body work of the aircraft carrier has been designed and made in India, about 50 per cent of propulsion system is of Indian origin and about 30 per cent of fighting capability of the warship are from India.

INS Vikrant, India's first indigenous aircraft carrier, to be launched on August 12 | NDTV.com



Stop wasting all out collective time.


CLOSE THE THREAD.
 
Bangladesh also thinking of building its own carrier. India can wait till rupee stabilized and BD gets its first carrier so that they dont have to run around the globe for technology transfer. We can always help..
dada bodhojom hoyeche bujhi apnar?tahole ektu eno kheye nin sob gas apnar peter theke beriye jabe:omghaha:
ENO0013.JPG
 
Pish!!

7 pages of discussion about a stupid thread written by some sensationalist mediaman??
 
So we dont have money and have to save some if we want to buy the carrier till 2020.Buy from whom?Ourselves?

And if you are brave enough to say yes please do tell me who is going to fund it till 2020 to be completed...
 
Bangladesh also thinking of building its own carrier. India can wait till rupee stabilized and BD gets its first carrier so that they dont have to run around the globe for technology transfer. We can always help..

:omghaha::rofl:
My Goddddddddddddddd.......:cheesy::cheesy::cheesy::cheesy:
 
dada bodhojom hoyeche bujhi apnar?tahole ektu eno kheye nin sob gas apnar peter theke beriye jabe:omghaha:
ENO0013.JPG

Dada we dont live in medieval country. These are contraband items in Bangladesh.

Bod hojom hole ekane doctor lever test kore tar por medicine prescribe kore.

Hojmi bikri nished.... apnara to carrier banate besto tai hojmi ki khoti kore seta jante vule gechen.
 

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom