khanasifm
SENIOR MEMBER
- Joined
- Apr 16, 2008
- Messages
- 7,082
- Reaction score
- 6
Same source shared the OP with images.
Sorry op with images ??? Not sure what u r referring too
I guess time will tell but supplying both customer is possible as first batch may be just few aircraft than the follow on batches may be spaced out, total order delivery spread out in multiple years but 16 plus 3 total 19 initial order may not require more than 2
PAC total capacity is 24 or 25 per year and assuming 16 or maybe less say 14 or 12 for paf rest can be diverted to foreign order per paf during one the airshow video from 2015