What's new

New Islamabad Airport Progress

17545431_1287079738027685_9014512808330720577_o.jpg




Runway Markings

.
.
17800198_1301524839916508_5119586560223959498_n.jpg


17424822_1282352115167114_8308698846607812475_n.jpg


17800079_1365972293483008_1544271381988452665_n.jpg


17424662_1282233678512291_761533575941876103_n.jpg
 
Will it have ILS 3 Landing System?

Yep the airport will become the third airport in the South Asian region after Lahore and New Delhi airports which will be equipped with the Instrumental Landing System (ILS) CAT III-B which will ensure smooth operations of flights even in dense fog and poor visibility up to 50 metres.
 
Yep the airport will become the third airport in the South Asian region after Lahore and New Delhi airports which will be equipped with the Instrumental Landing System (ILS) CAT III-B which will ensure smooth operations of flights even in dense fog and poor visibility up to 50 metres.

Just to correct you... Delhi, Jaipur and Lucknow Airports are ILS CAT lll-B .. ...Amritsar and Kolkata will get this system in Sep17.
 

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom