What's new

New Islamabad Airport Progress

Pics taken on 06 SEP.

IMG_9639_zpslxg6jp0r.jpg
 
. . . . .
How many frontmen in this project?

$$$$$

Sir, from what I've learned in the past month or so about Pakistani politics, is truly amazing. All politicians are corrupt across the globe. Pakistan is no exception. The law should be used to identify those and if the law forgives them, well the people should vote better the next time.

But the main thing is, the development and public welfare related work should never be stopped. The list of projects, pictures and statuses that I am seeing on here, are truly amazing and will bring Pakistan into the category of modern countries. Thanks
 
.
Sir, from what I've learned in the past month or so about Pakistani politics, is truly amazing. All politicians are corrupt across the globe. Pakistan is no exception. The law should be used to identify those and if the law forgives them, well the people should vote better the next time.

But the main thing is, the development and public welfare related work should never be stopped. The list of projects, pictures and statuses that I am seeing on here, are truly amazing and will bring Pakistan into the category of modern countries. Thanks

Another BUL CHIT

People of PAKISTAN DO NOT elect their leadership .
It is Deal Making Jernails with Saints like USA, EU, KSA etc doing it.

Why?

Because they like others to live in subversion

Meanwhile my your HOLY Elite makes $$$$

Development?

Another BS -

The most important development is HUMAN DEVELOPMENT. You focus on that, other things will happen.

But with these projects come lots of $$$$$$
 
. .
14650283_1472453136102503_8286313128103053171_n.jpg

___

PIA seeking construction of maintenance hangar - a two bay hangar with further provision for third bay at New Islamabad International Air Port (NIIAP).

Maintenance Hangar
Maintenance complex area=320m front x 150m deep = 48,000 sq m (516,672 sq ft)
Initial proposed 2 bay hangar with further provision for 3rd bay (either a hangar bay or Hard Stand Pavement)
Each bay = 90m wide x 70m deep x 26m high (clear span dimension)

Two Bay Hangar
Steel Structure (2 Bay) = 180m front x 70m deep
Concrete Structure (3 storied)
Covered Shed = 15m wide x 105m long
Paved Path/Road = 15m wide x 105m long

Third Bay Provision (Additionally)
Option-1 - Hard Stand Pavement Only
Option-2 - Hangar Complex

Source: PIA
 
. .
Construction of Road From Thalian on M-2 to New Islamabad International Airport Including Periphery Roads


14962637_1471403766207440_683335924367012213_n.jpg





14956476_1471403972874086_8220362878308748059_n.jpg






14937224_1471403706207446_1432516384632004856_n.jpg
 
. .
October 31st update from google earth
Link Road is cleared and work on going at top city/mumtaz city flyover.

ap3_zpsqvg6ljce.png




airport%202_zpswkftmjq1.png




airport%20road_zpsra0kkp64.png

_
 
. . .

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom