The 969-megawatt project is progressing timely as the civil works of both the underground powerhouse and transformers hall are complete. PHOTO: FILE

LAHORE: The 969-megawatt Neelum Jhelum Hydropower project is progressing timely as the civil works of the both the underground powerhouse and transformers hall are 95.5% and 99% complete, respectively, and are expected to finish in October this year.

This was briefed to Pakistan Water and Power Development Authority (Wapda) Chairman Zafar Mahmood during his weekly visit to the project site.

Neelum Jhelum: First unit to be commissioned in June 2017

The chairman visited the powerhouse, transformers hall, manifold area and switchyard of the project to review progress of construction work. Neelum Jhelum Hydropower Project Chief Executive Officer Engineer Muhammad Zubair, Project Director Nayyar Alauddin and representatives of the consultants and contractors were present on the occasion.

During the on-site briefing, the chairman was apprised that subsequent to the completion of civil works of unit No3 and 4 of the powerhouse, both units had already been handed over to the electro-mechanical contractor.

Hydropower: Three-fourths work completed, says Sher Ali

It was further informed that civil works of the switchyard are substantially complete, while electrical and mechanical works will also be completed by October 2016. Neelum Jhelum Hydropower Project Chief Executive Officer said that October 2016 is going to be an important month as the tunnel boring machine, deployed on the left tunnel will break through after completing the excavation work on the left tunnel. Overall progress on the project stands at 80%. The progress on C1 is 78%, on C2 is 80%, while on C3 is 83%. Out of total 68.6 kilometer, 62 kilometers long tunnels have so far been excavated.

The Wapda chief expressed satisfaction over the progress achieved so far on the project. Appreciating devotion and hard work of the project authorities, he said that Wapda is confident of completing the project according to the revised schedule.
 
.
Some Pictures of Neelum Jehlum :D :D

12472751_852518168191571_2985828253253526886_n.jpg
12592531_852518204858234_6322446409946561494_n.jpg
12920280_852518008191587_1845623451356213022_n.jpg
12923366_852517881524933_261769928661980291_n.jpg
12932949_852518001524921_599712453437752989_n.jpg
12963559_858347490941972_5812769317011097354_n.jpg
 
. . . . .
Thank U Sir for tagging me. Being initiated in January 2008 the project is vital to utilise the water of Neelum river in Jhelum river and for that Pakistan has used state of the art machinery. Pakistan has joined the club of those countries, which are using high-tech machines like Tunnel Boring Machines (TBM) in tunnel making for hydropower sector projects with the deployment of the two German-manufactured state-of-the- art gigantic TBMs at Neelum Jhelum hydropower project. India had tried to sabotage this project by initiating Kishanganga Dam on river Neelum but Pakistan somehow managed to get assurance from Hague's Permanent Court of Arbitration (CoA) to press India to honor Indus water treaty. The sooner the project completes the better. Hope the project completes now in August 2017 without hitting further snags. Here is the official overview.

http://www.wapda.gov.pk/index.php/neelum-jhelum

Gigantic TBM at work at Neelum Jhelum Project.

1504505_237652939748032_549290287_o.jpg
 
. . . .
What a beautiful site Inshallah this will help cut down the much needed energy crisis :pakistan:
 
. . .
Project is of Strategic significance ,as there is deadline attached to this project and Indian side is also trying to build similar capacity on there side so race is on who so ever build it first will have right on the water of Neelum /Jhelum .
 
.
Project is of Strategic significance ,as there is deadline attached to this project and Indian side is also trying to build similar capacity on there side so race is on who so ever build it first will have right on the water of Neelum /Jhelum .
Our right on Jhelum comes from geography. You are a lower riparian.
What you do is irrelevant. It is Allah's will.
 
.