What's new

Navy designs India’s largest ever ship, focuses on stealth and futuristic f

Nightmare?

Just Jap‘s tiny 27000-tonne frigate(at least how it is called by the Japs)?

You seriously think that your yet-to-be-finished drawings are gonna make us fret when we don't give a sh1t about and stand tall over the US’ 11 100000-tonne nuclear-powered flattops?

Stop kidding yourself。India does not even register on our radar。:omghaha:

:rofl:...'Made in China'.:D
 
.
That's exactly why we are stronger than India and taken more seriously in the international community. India is only given attention when the someone wants a favour from India.

This is why we will always remain ahead if India.

Your Country is Trying to Recreate Borders by Force.....Dont worry its a Matter of Time beofre you are clobbered down.

China was Hammered by Vietnam
China was Hammed in Korea

In 1962 you won againt us because our standing Army was 80,000 and PLA 120,0000.....

Sunny Jim just wait...you are awkening a Giant....You and your Poodle needs massive Taming.
 
.
"Large size" seems to be the latest fashion trend.......Japan recently showed off her largest warship she ever built.

That would be Japan's WWII 72,000 ton Yamato or Mushashi battleships?

Yes recently Japanese flat-topped "destroyers" are growing large.
 
.
Nightmare?

Just Jap‘s tiny 27000-tonne frigate(at least how it is called by the Japs)?

You seriously think that your yet-to-be-finished drawings are gonna make us fret when we don't give a sh1t about and stand tall over the US’ 11 100000-tonne nuclear-powered flattops?

Stop kidding yourself。India does not even register on our radar。:omghaha:

Indian fools here are employed by the Japanese as their Cheerleaders
 
. . .
The navy’s design centre has completed designs for Project 15B.
The design of Project 17A, an estimated rS 50,000 crore programme to build seven frigates, has also been completed and final nod is awaited from the defence ministry to launch construction. Cost negotiations have been completed for Project 17A


Work on India’s first completely indigenous next generation missile corvette, Project 28A, is already underway

the first boat which is undergoing sea trials is expected to be inducted by the end of this year after much delay



Highlights.Kamorta this yr.
 
. .
India needs to focus more on improving her shipbuilding capabilities, specifically the ability to integrate various imported sensors and weapons. Designing a ship is one thing, but fabricating it is another. The Kolkata class was designed over 17 years ago, but the lead ship of the class has yet to enter service after 10 years at the yards.

Without seriously upgrading her shipbuilding industry, this new stealth ship will undoubtedly face many years of delays.

Furthermore, without indigenous capabilities for producing world-class sensors, weapons, and combat information systems, India will always overpay for imported systems and have endless problems integrating them.

These lessons should have been learned a long, long time ago.

With India's deteriorating economic situation, money will be short. It's high time to focus on indigenization to make limited funds stretch further.

Sigh...
 
.

Latest posts

Country Latest Posts

Back
Top Bottom