What's new

Mumbai metro to start Operation this Month.

Metro Map of Mumbai

proposed_mumbai_metro_map.jpg
 
. . .
Features of Mumbai Metro Rail

Some of the attractive and technical features of the Mumbai metro system are mentioned below:
  • Four or Six Coaches
  • Single class
  • Air conditioned
  • 80 kmph maximum speed
  • 33 kmph average speed
  • m/sec2 acceleration
  • 1.2 m/sec2 deceleration
  • 1500 accommodation capacity
  • 60,000 pphd system capacity
  • Automatic Ticket Collection
  • Train control with Driver
  • Operation Control Centre
  • Closed Circuit Television
  • Dynamic visual displays and loudspeakers

Kilometers (Km) Fares (Rs.)
Upto 3 = 8
3 to 8 = 10
8 to 12 = 12
12 to 15 = 14
15 to 20 = 17
20 to 25 = 20
25 to 30 = 22
30 and above = 24
 
.
. . .
Cost of the Versova-Andheri-Ghatkopar stretch is Rs 2,356 crore (~400 mn in present day terms - slightly more during the execution phase of the project). The phase-2 (Charkop-Bandra-Mankhurd) will be Rs 7,660 crore ($1.25 billion). If someone wants, I can post the sources.

Some months back, a mono-rail was also commissioned in Mumbai - I guess people would already be aware of that.
 
.
Do you know the total cost of Delhi metro combining all the phases? I would guess it would be around $10 billion.



It will take close to 10 years to complete the whole project like it took in Delhi.

no idea about the delhi metro project cost.
 
. . .
Mumbai metro has the worst coaches Bangalore or Gurgaon metro coaches are much better.

Train Interior

HK_MTR_M-Trains_Interior.jpg


@scorpionx dada, Kolkata me bhi elevated metro ka kaam chal raha hai na ?

There is a little reminder in Chinese in the top right corner of the picture. Do all the metro carriages carry warnings in multiple languages?
 
.
There is a little reminder in Chinese in the top right corner of the picture. Do all the metro carriages carry warnings in multiple languages?

No . . these coaches are imported from china i guess. may be thats the reason.
 
. . .
Back
Top Bottom