Hey.. I am a bit confused now.. What is the date of 2014-15 for 1st squad. I was under the impression that the 1st squad will be ready in 2011
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
wooo what way to start the morning,met department says it can rain today in banglore...i hope it does not....jha ji stay ready with ur cam sirji we need the bird to be clicked and posted here...
sorry biradar..out of bangalore now...in kolkata....
any mujahid in bangalore around HAL..??
within 2-3 tejas become more advance than there jf17 for sure..
within 2-3 tejas become more advance than there jf17 for sure..
^ Thats fine mate, we got people like that on both sides
But coming back to LCA, even if the MMR wasnt ready in time i think you guys did a remarkable job with FBW controls atleast. Mastering AFCS will prove to be an asset, especially for AMCA
On 28th nov 2009 a top DRDO official said kaveri engine would be ready for Tejas by march-april 2010
The first 20 jets will be powered with foreign engine. This month LCA was supposed to be flight tested with a Kaveri engine for evaluation purposes.
Now I don't think that DRDO can drag it much further ...Especially after recent reports of cost escalation.
About Radar, other members would be more helpful.
foreign engine is not for just 20 planes...even first few squadrons of MK-2 will be powered by foreign engines only...and the way KAVERI is going ,it seems to be integrated into AMCA only...
about radar- MK-1 will be having ELTA-2032 while MK-2 will have ELTA-2052 which is an AESA radar untill our own MMR (AESA) comes out because it is still not finished...