What's new

Landing Craft (Mechanized) (LCM) to Pakistan Navy

. .
first 4 Subs will be constructed in china and works in progress where engineer technicians etc will learn after that rest will be made at home

I meant that as Karachi shipyard has already built a Agosta 90B, so it is already among those elite shipyards which build warships and submarines both.
 
. .
These LCMs will be used by Pakistan Marines .
Pakistan should built 2 missile crafts per year. And also focus on Houbei class crafts
 
.
Finally PN getting the much required attention. However I still feel it apart from those subs we need some heavy ships as well a couple of destroyers maybe. Plus a potent naval air arm to counter the threats we would face in future as Gawadar becomes operational.
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom