What's new

Lahore Rapid Mass Transit Rail Project

pkpatriotic

SENIOR MEMBER
Joined
Apr 2, 2008
Messages
2,317
Reaction score
0
Lahore Rapid Mass Transit Rail Project

The proposed rail service is the main part of the Lahore Mass Transit System (LRMTS). Other components of this project include the now under construction Lahore Ring Road Project.
LRMT8.jpg

The Photo above shows the Route Map of LRMT Phase I - Green Line

The LRMT is a Two-phase, 97 kilometes long project. A Hong Kong based company called MVA Asia Consultancy was hired the government of Punjab as consultants to prepare the project feasibility. The study of MVA Asia Consultancy completed 5% of project design and proposed four Rail lines in the city to share the traffic burden. The proposed capacity of LRMT is going to be able to move 35000 passengers per hour in the city. Funding for the project will be provided by the Asian Development Bank (ADB).

PHASE I:
In Phase-I two tracks will be constructed. One will be a North-South route called the Green Line and other will be a East-West route called the Orange Line.

Green Line:
Green Line is going to cost US $2.4 billion to construct.

The Green Line would extend from Shahdara to Hamza Town via Ravi Road, Lower Mall, Mall Road, Fatima Jinnah Road, Qartaba Chowk and Ferozepur Road areas.

LRMT2.JPG

The Photo above shows the Route Map of LRMT Phase I - Green Line

The length of Green Line is going to be 27 km. 11.6 km long Green Line route would be underground, while 15.4 km long would be overhead.

There will be 12 underground and 10 overhead stations built on the Green Line route.

The completion dates of ‘Green Line’ is in 2011. Initially the project was supposed to finish in 2012 but due to Cricket World Cup od 2012 wher Lahore will be hosting few matches, the Green Line completion date has been pulled in to 2011. Initial estimates are that 227,000 people annually would benefit from the Green line.

In March 2007, Punjab Government invited Dr E. Sreedharan who is the managing director of successfully operating Delhi Metro Rail. After studying the project details Dr Sreedharan has declared Green Line Project as a viable one. He has inspected the first priority line’s route from Shahdara to Hamza Town. In his view, the implementation of the Green Line project (Phase I) would face no major technical difficulty because the soil condition en route was good and roads were wide, having room for underground construction without creating any serious inconvenience to the city.

Orange Line:

Orange Line is going to cost US $1.9 billion.

LRMT4.jpg


Its route would extend from Pakistan Mint to Sabzazar via Shahnur, Awan Town, Hinjarwal, Niaz Beg, Canal View, Wahdat Road, Ali Town, Salahuddin Road, Bund Road, Islam Park, Dera Gujjran Depot, Mahmood Booti, Salamatpura, Samanabad, Gulshan Ravi, Chauburji, Lake Road, Lakshami Chowk, Railway Station, Sultanpura, UET, Baghbanpura and Shalimar Garden areas.

The length of Orange Line would also be 27-km out of which, 6.9 km long tracks would be underground, while 20.2 km-long would be overhead upon which six underground and 20 overhead stations would be established.

The central interchange station of Green and Orange lines would also be established besides linking these lines at Ring Road, railway station, airport, and Sports City.

The completion dates of ‘Orange Line’ is in 2015. Initial estimates are that 245,000 people annually would benefit from the Orange Train.

PHASE II:

The completion year for phase II is 2020.

In Phase-II, two more tracks will be laid out. These routes will be called Blue Line and Purple Line.

Blue Line:

LRMT6.jpg


The route length of blue line is going to be 24 km. The ‘Blue Line’ will start from Chauburji and end at College Road, sources said, adding that from Chauburji the line would pass through Mozang Chungi, Shadman Chowk, Jail Road, Mian Boulevard Gulberg, Mian Boulevard Garden Town, Faisal Town and end at College Road.

Purple Line:

The route length of Purple line is going to be 19 km. Purple line would start from Bhaati Chowk and end at Allama Iqbal International Airport. The line would pass through Bhaati Chowk, Brandreth Road, Railway Station, Allama Iqbal Road, Dharampura, Ghazi Road and end at Allama Iqbal International Airport

The Train Capacity:

One unit of air-conditioned train will have the seating capacity of 500 passengers.

Stations:

LRMT3.JPG

Train stations on the elevated route would be designed like overhead bridges while train stations on the underground route would have two entranceways and two exits.

Environmental Concerns?

Just like with every Mega project, voices of dissent have started appearing for the project where people have shown concern for environment and noise levels of elevated trains. Dawn’s editorial on Jult 12, 2007 covers these voices very concisely and I’ll quite the editorial here:

The first two lines will cost $3.3 billion. In real terms, the cost of the project is yet to be worked out. Surely, notes of dissent are expected to start pouring in. The economists are going to question the heavy debt the project will incur for the government and the citizens, while the opposition politicians are most definitely going to give their own colour to these lines and the sabza group may soon be out to enumerate the effects of this development on Lahore’s environment. Some of these points may be very valid and should elicit a thoughtful response from the government. There can be no moving ahead without this exercise. The sooner this essential exercise is carried out the better it would be for everyone.

Noise: I couldn’t find the details on expected noise levels around elevated portions of the track but noise is definitely going to travel far and away if sound barriers are not constructed around the tracks. More than normal decibels of noise are already witnessed around Pakistan Railway’s elevated track which runs from Lahore Station to Badami Bagh.

Previous Light Rail Studies or Projects:

LRMT7.jpg


The current project is definitely not the first attempt to build a rail based mass transit for Lahore. In 1991 during Nawaz Sharif’s termas prime minister, the feasibility of a light rail transit system was determined by Japanese development organisation (JICA). It had proposed a 13 kilometre long system. The study was reviewed and updated as part of the World Bank funded “Lahore traffic and transport studies” in 1993.

The system’s cost was estimated at about US $400 million, but with better network coverage. In 1995 Japan proposed financing the original scheme with grants and loans of about US $495 million, but the project could not be implemented due to many reasons.

Fares: Back in July 2007, it was reported in Daily Times that Passengers of the Lahore Rapid Mass Transit (LRMT) would be charged Rs 125 to Rs 140 to travel from one end to the other of the 27 kilometre-long Green Line.

“Sources associated with the project told Daily Times on Thursday that this (Rs 125-Rs 140) one-side fare had been calculated after taking into account the rendered $2.5 billion cost of the project, which is expected to be completed by 2011. Sources said that to pay back the loan likely to be incurred on the LRMT project, the government would have to charge high fares from the passengers. Currently, the public transport fare from Kahna to Shahdara is between Rs 20 to 25. By 2011, it would rise between Rs 25 and Rs 30. They said that to charge a passenger of the LRMT Rs 30 for a one-side visit, the government would have to give a subsidy of at least Rs 100 per person, which was not possible for the government.

While Rs 140 one way fare indeed looks ridiculous right now, passengers may end up paying much more than road transport. The benefiit however will be ease of travel, no traffic jams and hopefully a strict adherence to time table.

Hope: Many years ago I took a course in Engineering Economics. I still remember one sentence from my text book. It read as:

“All mega projects should be built as soon as possible after their design is done and funding is secured otherwise opposition to the project grows on POLITICAL basis.”

When we look around the mega projects of Pakistan, it appears so true. If big projecs are not started quickly they never will because somebody will always find a reason to do politics on the issue. In the end we sincerely hope the project sees the light of the day and does not end like the one in works for Karachi (called KMTP/KCR) for the past 33 years. Lets all hope for the best and we will continue to add updates on this project in the comments section below.

References
(1) Dawn Editorial of July 12, 2007 here.
(2) The News, February 26, 2006 here.
(3) MVA Consultancy
(4) Business Recorder Edition of June 10, 2007
(5) The Daily Times Edition of March 14, 2006
(6) ZeeNews edition of March 5, 2007
(7) Lahore Signs Light Rail MoU: September 1, 2002.
(8) Daily Times Edition of July 7, 2007
 
.
Well Researched an presented, but if does become a reality (Inshallah) then our business will go bust... (New Khan Metro) :( Ohh Well!
 
Last edited by a moderator:
. .
Great news guys, I talked to Ahmed Rafay Alam yesterday and he's saying that work on the project is back on with the approval of the CM. The company doing consultancy for the project MVA Consultancy is working but with the Turkish President in town, speculation is rife that the project consultancy might be handed over to a Turkish company.

Hoping project works out smoothly.
 
.
Rs. 140 a side. will anyone pay such a fare? its too much for worker class who will be the main consumers of this service.
 
.
Rs. 140 a side. will anyone pay such a fare? its too much for worker class who will be the main consumers of this service.

Rs. 140 was proposed back then. Wonder what effect inflation will have on the fares. Obviously not desirable.

They will definitely start a monthly/frequent ride card which will obviously be cheap. Rs. 140 is supposed to be the one way maximum charge but a normal ride might cost around Rs. 60 or 70.

Back and forth on one day = Rs 60 x 2 = Rs 120
No. of Trips per month = 25
Total cost = Rs. 3,000

Obviously nobody will be spending this much money. First time riders would jump for the ride but hardly a large population would use it at these rates. A Rs. 1,000 per month card is way too expensive as well.

The problem is LRMT is not a cheap project. Construction and running cost are extremely high. A non existent tax base cannot allow the government to subsidize public transport systems (nor has the state shown any intention of being interested in public transport, ever !). A widened tax base will obviously allow the government not only to subsidize a public transport system, but introduce mass transit systems across major towns. Hail the non tax paying population.
 
.
Rs. 140 was proposed back then. Wonder what effect inflation will have on the fares. Obviously not desirable.

They will definitely start a monthly/frequent ride card which will obviously be cheap. Rs. 140 is supposed to be the one way maximum charge but a normal ride might cost around Rs. 60 or 70.

Back and forth on one day = Rs 60 x 2 = Rs 120
No. of Trips per month = 25
Total cost = Rs. 3,000

Obviously nobody will be spending this much money. First time riders would jump for the ride but hardly a large population would use it at these rates. A Rs. 1,000 per month card is way too expensive as well.

The problem is LRMT is not a cheap project. Construction and running cost are extremely high. A non existent tax base cannot allow the government to subsidize public transport systems (nor has the state shown any intention of being interested in public transport, ever !). A widened tax base will obviously allow the government not only to subsidize a public transport system, but introduce mass transit systems across major towns. Hail the non tax paying population.

Too expensive to import the technology and maintain the service. Delhi's Metro is considered low-tech "Light Rail Transit" (LRT), not high-tech "Mass Rail Transit" (MRT). This is one of the major reasons for importing China's advanced MRT Metro system to Bombay (the first in India). This would provide 'bragging rights' and improve the 'image' of Mumbai, and hence India as a whole. :angel:
 
.
Too expensive to import the technology and maintain the service. Delhi's Metro is considered low-tech "Light Rail Transit" (LRT), not high-tech "Mass Rail Transit" (MRT). This is one of the major reasons for importing China's advanced MRT Metro system to Bombay (the first in India). This would provide 'bragging rights' and improve the 'image' of Mumbai, and hence India as a whole. :angel:

I sat on the Delhi Metro just after the very first line had been completed and it seemed adequate enough to accommodate the sea of people that roam Delhi. Mumbai definitely needs an entirely new system of transportation, for its problems can be matched only by that of Tokyo.
 
.
Yea Delhi metro is very good, seems like you are not in Delhi when you travel in it, however it won't work in Mumbai. We can do same in Lahore but overground in Karachi.
 
.
Multi million $$$ of corruption has taken place in this project.
More then 55 crore rupees corrution took place and acussed have been caught some are on the run.
Just hope this project completes soon.
After then karachi,islamabad.quetta and peshawar should be given some importance in this reguard.
 
.
Rs. 140 a side. will anyone pay such a fare? its too much for worker class who will be the main consumers of this service.

The comparatively higher fares of the MRT might address the concerns of existing public transporters such as our Rescue Ranger sahab's family.

The lower fares on road based public transport would continue to offer choices to commuters, and with a significant section of the public hopefully choosing to travel by the MRT, it would relieve the strain on the roads.
 
.
Great news guys, I talked to Ahmed Rafay Alam yesterday and he's saying that work on the project is back on with the approval of the CM. The company doing consultancy for the project MVA Consultancy is working but with the Turkish President in town, speculation is rife that the project consultancy might be handed over to a Turkish company.

Hoping project works out smoothly.

oh well the project was only cancelled for a couple of weeks/months. CM Punjab cancelled the project saying Lack of funds. But when he was declared "ineligible" to contest elections by the court..... remember Salman Taseer was the sole head of the government for a couple of weeks after Mr Shahbaz Sharif's government was overthrown............ He started few cancelled projects once again and this Lahore Rapid Mass Transit project was one of them.
 
.
oh well the project was only cancelled for a couple of weeks/months. CM Punjab cancelled the project saying Lack of funds. But when he was declared "ineligible" to contest elections by the court..... remember Salman Taseer was the sole head of the government for a couple of weeks after Mr Shahbaz Sharif's government was overthrown............ He started few cancelled projects once again and this Lahore Rapid Mass Transit project was one of them.

it was not salman taseer who is interested in this project its CM punjab who wants to build this project in lahore .. right now his main focus lahore ring road project which is costing almost 115 billion ruppes n work on this project is on full swing :cheers: after it they will go for lahore rapid mass transit project INSHALLAH :cheers:
 
.
lets hope its completed on time,:pakistan::victory: and is there any transit mega project in islamabad?????????
 
.
this project can attract alot of people . i hope it completes really quick
 
.

Pakistan Defence Latest Posts

Back
Top Bottom