What's new

Khyber Pakhtunkhwa Updates

Cleanliness Standards Of Peshawar City In 1942.


1617760312999.png
 
.
Main Contractor of Mohmand Dam CGGC is looking for heavy machinery operators/Drivers for the Project.

Kindly share your details at the following:
piaoronghui@qq.com or
WhatsApp: +92-332 8992143
+92-345 9499221


1617915787485.png
 
.
After Torkham , a transit trade was inaugurated for the first time at Ghulam Khan border in the tribal district of North Waziristan . After the transit trade , the Ghulam Khan border will be traded to Central Asia . After Ghulam Khan border was opened , two vehicles of the transit trade arrived from Karachi . Khan Departed to Kabul at the border .

In the opening ceremony was attended by Minister Relief Iqbal Waziristan , Provincial Minister for Transport Shah Muhammad , Deputy Commissioner North Waziristan and Tribal leaders .

The launch of transit trade at Ghulam Khan border will become a source of economic prosperity for Waziristan and Pak Afghan . N further to bilateral trade thousand local people will get employment opportunities through transit trade at Ghulam Khan border .


1617916616465.png





1617916642589.png
 
.

Sports Complex Kohat
up-gradation will be completed by June 2021.

Khyber Pakhtunkhwa Government establishing Sports Complex in all regions of the province.





1617994317508.png





1617994359302.png





1617994384497.png
 
.
Construction of new 90 OPD and Procedure Rooms in Khyber Teaching Hospital Peshawar enters final stages. The new OPD will be inaugurated by CM KP Mahmood Khan in this month.

1. 90 OPD and Procedure rooms in Khyber Teaching Hospital
2. Pathology Laboratory
3. Blood Bank
4. Laundry
5. CSSD
6. Pharmacy department
7. Khyber Bank
8. Cafeteria


Cost :: 700 million rupees
Area :: 110,000 square feet

Inauguration by 30th April



1617994748285.png





1617994768898.png





1617994811618.png
 
.
DOLSAR Engineering Inc. Co. has signed a new contract to provide Consultancy Services for Preparing Kurram Tangi Integrated Water Resources Development Project in Pakistan.

Main project components include a 98-meter-high concrete faced rockfill dam located across the Kurram River in North Waziristan in Khyber Pakhtunkhwa (KP) Province, three hydroelectric powerhouses with combined installed capacity of 65MW, two diversion weirs,

Thal irrigation canal and remodeling of the existing Civil/Kankot and Marwat/Right Bank irrigation canals. Combined, these canals were envisaged to cover a total cultivable command area of 140,000 ha. The project is financed by the Asian Development Bank.


1618101466763.png
 
. .
The extension of Baran Dam in Bannu district which will bring thousands acres of barren land under cultivation in the area and will also serve as a tourist spot.


1618250744751.png




1618250768948.png
 
.
Contract signing of Grid Interconnection Studies for Lawi Hydropower Project, Chitral
Credits: PEDO


1618251364195.png
 
.
Jaggran-I Hydropower Project is operational since October 2000 with 05 Pelton Turbines and providing electricity to Peshawar Electricity Supply Company (PESCO) through 132 KV Muzaffarabad Grid Station.

There are total 06 Hydropower Projects proposed on Jaggran Nullah. Jaggran-I is completed while Jaggran-II is about to complete. Jaggran-III is at the EPC stage reportedly while Saudi Arabia to fund Jaggran-IV which shall be started by the end of 2022.

Out of 06 projects, Jagran I, II & IV are under public sector whereas, the Jagran– III hydropower project will be a private sector project. Jaggran-V and Jaggran-VI are in the pipeline which shall be started in later stages.


1618323308612.png




1618323327984.png




1618323354098.png
 
.
KP government has appointed collectors to acquire land for a 4-lane controlled-access motorway to extend the nearly-completed M-14 motorway to Zhob city of Balochistan.

According to Faisal Amin Gandapur, a member of KP Assembly from the ruling PTI, there was a missing link in the CPEC western route from Yarik area in D.I. Khan district to Zhob district in Balochistan.

The new motorway will complete the controlled-access route from Islamabad to Zhob, which further leads to Karachi and Gwadar.
 
.
800 MW Mohmand Dam Hydropower Project Under Construction.
Under Construction since September 2019
Gross Storage 1.2 MAF
Annual Energy Production 2,862 GWh
Completion date: May 2025


1618405339517.png
 
.
𝐉𝐇𝐏𝐏2 Work on the project continues. 3.95 Km of tunnel excavation has been completed which includes 2.99 Km of Headrace Tunnel. Besides tunnels, earthwork of Weir flow section has also been completed and being prepared for structural works.


1618426113710.png
 
.
Peshawar to get Pakistan’s First innovation park

As part of the KP 4.0 digital agenda, KPK's advisor to the Chief Minister on Science and Technology, Zia Ullah Bangash, announced Thursday that Pakistan's first innovation park would be built in Peshawar.

The park will hold offices for a variety of IT firms, allowing several tech companies to collaborate and share expertise and skills.

According to the minister, the “KP 4.0 Connecting The Dots” is a 10-years vision for science, technology, and innovation, meant to align Khyber Pakhtunkhwa with challenges and opportunities of the 4th industrial revolution and provide the best possible opportunities in the science and technology sector to the youth.



1618508176925.png
 
. .
Back
Top Bottom