What's new

Key Indian nuclear submarine INS Arihant damaged, Suffered major damage due to ”human error”

. .
. .
We have two SSBN and One SSN. We are building five SSBN and seven SSN.

But the irony is Arihant total project cost is $2.8 Billion that's more than all your navy ships! F-22P or Agosta! hhaha
This is not a sensible answer.
Out of fleet of 2 subs, both are in repair yards. Considering the track record, its safe to assume that once IN will operate 12 nuclear subs, then atleast 10 of them will prefer to stay in repair yards in stead of open sea. :smokin:
 
.
Funny paksitanis care so much. Is that because they don’t have any ships in their navy?
 
.
This stuff was discussed to death a long time ago and is fake :disagree:.
Keep in believing on these fantasies.

But Indian Navy's performance in the past few years did give lots of credibility to his account. Post #25 sums up nicely. Sure you can always pretend they are FAKE.
 
Last edited:
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom