N.Siddiqui
ELITE MEMBER
- Joined
- Nov 21, 2015
- Messages
- 9,714
- Reaction score
- 13
- Country
- Location
It is no more KCR(Karachi Circular Railway) as it doesn't circle the city as the city is 8-10 times bigger now in area and in population.
And it need to be a METRO train, like all the corridors planned for Karachi BRTS need to be converted into a METRO train, except for the about to be completed Green line BRTS(Surjani to Numaish).
There are six corridors planned for Karachi BRTS and now looks an uphill task and not cost efficient and of less utility.
Need to turn these into METRO train corridors.
And it need to be a METRO train, like all the corridors planned for Karachi BRTS need to be converted into a METRO train, except for the about to be completed Green line BRTS(Surjani to Numaish).
There are six corridors planned for Karachi BRTS and now looks an uphill task and not cost efficient and of less utility.
Need to turn these into METRO train corridors.
KCR part of CPEC but hardly on track
Under CPEC, ML-1 hundred times more important than KCR
www.samaa.tv