What's new

Kalabagh dam: PML-N’s solution to our energy crisis?

Edevelop

ELITE MEMBER
Joined
Feb 2, 2007
Messages
14,735
Reaction score
23
Country
Pakistan
Location
Turkey
Pakistan, after the elections, is once again faced with perhaps the most divisive political issue- the construction of the Kalabagh dam. One of the many expectations from the Pakistan Muslim League-Nawaz (PML-N) is to bring to life the Kalabagh dam; a subject that has been brushed under the carpet for a long period of time.

So, the questions arise, will Mr Nawaz Sharif be able to address this issue through consensus among the provinces? And, will we as Pakistani citizens for once rise above our internal conflicts and work towards our collective development?

It cannot be ruled out that the Kalabagh dam issue is ridden with conflicts, with the province of Sindh at the forefront of the opposition and Balochistan also spelling out its reluctance. The reason behind this resistance has been clearly highlighted by Sindhi and Balochis. They fear that with the construction of the dam, Punjab will unlawfully divert the water to irrigate their own land, leaving the other lands arid.

Their stance is quite clear; they want the site of the Kalabagh dam to be shifted away from Mianwali. I am not denying nor challenging their demands. My contention is that if a nation is within the grip of unprecedented and acute electricity shortages which does not only hamper economic development but also takes its toll on the people’s daily lives, the construction of the dam should be made a priority.

Agricultural sub-committee of the Multan Chamber of Commerce and Industry is also emphasising the need to undertake Kalabagh construction work. It is believed that only through Kalabagh, the country will be in a position to safeguard its agricultural based economy which is adding 26% to the GDP, and livelihood of 52% of the total population is dependent upon it.

Moreover, many in Pakistan are supportive of the Kalabagh project, as this dam will help to utilise surplus water of the river Indus. It also happens to be one of the most investigated projects in the world. It has not only gained financial support from the World Bank but also from many international agencies.

Yet, this does not allow the construction of the dam to escape criticism from people who hold to the view that this dam will displace a large number of people and inundate fertile lands in Khyber-Pakhtunkhwa and Punjab. Their apprehension stems from the fact that many acres of land could be lost due to water logging in Mardan, Swabi and Charssada.

One of the fears is that if Kalabagh is implemented, there will be no water available for downstream Kotri in the future leading to a chaos in the delta and the katcha areas of Sindh. The sea intrusion caused by this dam is also predicted to cause heavy financial losses to the Sindh economy. These fears are relevant but it is also important to remind us that Pakistan spends $7 billion yearly on import of fuel for operating thermal power units- let’s say if Kalabagh is built, the country will be absolved of this burden that has strangled the country’s economy.

Kalabagh could actually help Pakistan get out of its circular debt.

Some argue that Diamer Basha is of more relevance for Pakistan, even though I do not completely disapprove their stance, I still believe that Kalabagh is far more superior to Diamer Basha. Kalabagh being located in Mianwali District, is easily accessible and close to the network of power transmission that is certainly not the case with Basha located 197 miles upstream of Tarbela which is quite difficult to access.

The mean annual river flows at Kalabagh is much higher approximately 90 million acre feet (MAF) compared to around 50.53 MAF mean annual river flow at Basha.

One of the main reasons why Kalabagh should be given priority is because it is almost ready for construction and if proper work is undertaken this projected can be completed in six years meanwhile Diamer Basha’s construction period may exceed ten years due to difficulty in accessing the location.

The crucial factor that points in favour of Kalabagh is the low cost that this project entails. Cost wise, Diamer Basha is substantially more expensive than Kalabagh.

It is true that both Kalabagh and Diamer Basha are indispensable for meeting for accelerating electricity and water requirements in Pakistan but Basha certainly fails to be an alternative for Kalabagh as it is only the latter that can provide hydropower and irrigation water that is required in the coming years.

It is vital for the government of Pakistan, PML-N, to start taking the long awaited steps needed to lead Kalabagh Project to its completion. Although, nothing has been done in the last few years to build the consensus of the provinces over the Kalabagh dam, let us hope that PML-N in 2013 puts it act together to get this consensus.

It has been proposed that a “Dispute Resolution Commission” consisting of politicians, engineers and people who are actively involved in keeping the Kalabagh issue alive should be set up.

The aim should be to propagate with facts and figures among the people of Sindh that they will be the maximum gainers if Kalabagh Dam is built and will be its worst victims if it is not built.

It is crucial for Pakistan to determine and sort out the real causes of opposition to the building of the Kalabagh Dam and take concrete steps to address them. Perhaps, it is mandatory to discuss this issue more openly through talk shows and debates on the media and at other forums.
on Twitter, become a fan on Facebook

Kalabagh dam: PML-N’s solution to our energy crisis? – The Express Tribune Blog
 
. .
We will, see. He already has declared that 'khazana khali hi', what he actually meant was 'mera pait khali hai'.

If NS is to be believed than there are no funds forthcoming to carry out such a venture. RIP
KBD is a done deal, thanks to nationalists.:closed:
 
.
Another Dam wow! Are dams the only solution to energy crisis? People should use their DAMN mind.
 
. .
Pakistan needs this dam. For storage purposes as well as energy.

Water resources are dwindling. Water needs are rising. We need a big dam as a consequence. Some intense lobbying is needed.

Pakistan has not built a dam for 50 years. Considering the rate at which our population is increasing, water shortage problems of future will make energy shortage issue of today like a walk in the park.

This is a very serious issue. If Nawaz Sharif can promise to at least make an effort, for the sake of my country, I m with him.
 
.
Another Dam wow! Are dams the only solution to energy crisis? People should use their DAMN mind.

Are you a Pakistani? Are you aware of current situation of Pakistan? Are you aware of the Kalabagh dam project? With Kalabagh dam, not only most of the energy shortage could be fulfilled but the summer floods that result in loss of millions every year could have been stopped.

The project however ends because it would be built in Punjab and the storage lake would be in KPK, the water flowing to Sindh would be halted. PML-N is just boasting over this project which is itself at halt for years now and isn't PMLs project.
 
. . .
The World doesn't work according to 'your preferences'.

Ok man whatever you say! I hope this energy crisis will be solved soon.
 
.
i love KBD but in reality and in current situation i dont think PML-N have the balls to take such risk :(. i think KBD can generate about 4.5MW if i'm not wrong and Dams are much cheaper then any other source too
 
.
Its not just about generating electricity but also storing water !
 
.
One of the main reasons why Kalabagh should be given priority is because it is almost ready for construction and if proper work is undertaken this projected can be completed in six years.
That's an optimistic time line. It could stretch to 6-10 years, considering the ancillaries that have to be constructed like canals etc. The question is, what is Pakistan going to do in the meanwhile? Remain with acute power shortages till the dam becomes operational?

Are there any alternative arrangements being made? How about establishing wind and Solar power farms that would augment the present requirement of electricity within a much shorter time frame? Any plans afoot?
 
.
Just build it, and finish it quickly...

Let them cry who wants to. We need to encash these project quickly. We can't stop our projects just like that.

- Gwadar port due to Dubai reservation
- Coal projects due to environments reservations
- Civil Nuclear due to West Reservations.
- and Kalabagh due to racists parties reservation.

Pakistan needs to be the Best, F the rest...

That's an optimistic time line. It could stretch to 6-10 years, considering the ancillaries that have to be constructed like canals etc. The question is, what is Pakistan going to do in the meanwhile? Remain with acute power shortages till the dam becomes operational?

Are there any alternative arrangements being made? How about establishing wind and Solar power farms that would augment the present requirement of electricity within a much shorter time frame? Any plans afoot?

The power house and the Dam (reservoir) can be build very quickly. But yes Canals may take time.

Wind is way to expensive atleast now, while for Solar Power Farms still lot of feasibility research is required. atm Pakistan can think about bringing consumer/industrialists interest in these projects to remove burden on the Government
 
.
BLgD2glCUAETMAh.jpg
 
.
Back
Top Bottom