K-2 nuclear power plant connected to grid
This photo shows construction work taking place on the K-2 and K-3 nuclear power plants. — Photo courtesy PAEC website
ISLAMABAD: The Pakistan Atomic Energy Commission (PAEC) on Thursday announced that it had connected the much-awaited 1,100MW Karachi Nuclear Power Plant Unit-2 (K-2) to the national grid.
In a statement, the PAEC termed it a ‘Pakistan Day’ gift to the nation. It said the nuclear power plant (NPP) had achieved criticality at the end of February and was undergoing certain safety tests and procedures before it could finally be connected to the national grid.
The loading of nuclear fuel onto the plant was started on December 1, 2020 after getting clearance from the Pakistan Nuclear Regulatory Authority.
The PAEC pointed out that K-2 is the first nuclear power plant in Pakistan with a generation capacity of 1,100MW and its addition to the national grid will “surely help improve the economy of the country”.
K-2 is one of the two similar under-construction nuclear power plants located near Karachi and will be inaugurated for commercial operation by the end of May this year.
The other one, K-3, is also in completion phase and is expected to be operational by the end of this year.
The PAEC is now running six NPPs in the country — two located in Karachi and four at Chashma in Mianwali district. Earlier, the collective generation capacity of all PAEC-operated nuclear power plants was around 1,400MW.
The coming online of the Karachi Nuclear Power Plant Unit-2 will nearly double the generation capacity of nuclear power plants in the country, substantially improving the overall share of nuclear power in the energy mix.
Pakistan Atomic Energy Commission Chairman Muhammad Naeem congratulated Member Power Saeedur Rehman and his team on this great achievement.
In a statement, the Pakistan Atomic Energy Commission has termed the plant a ‘Pakistan Day’ gift to the nation.
www.dawn.com