So how many we have in our inventory till today...i think 8 jfb was handed over in December...definitely assembly lines were busy when PAC handed new planes...can anyone explains...at a time how many can be assembled.n how much time is required for one plane...assembly lines works parallel ...plz some explain
 
So how many we have in our inventory till today...i think 8 jfb was handed over in December...definitely assembly lines were busy when PAC handed new planes...can anyone explains...at a time how many can be assembled.n how much time is required for one plane...assembly lines works parallel ...plz some explain

i think the number was 12 last year, 14 more B in pipeline for 2020.
 
i think the number was 12 last year, 14 more B in pipeline for 2020.

highest serial was 19-612 which was 2P-72

in 2019 - 8 x JF17B in 2019 and 12 x JF17A Block II last one being 2P-62 Block II

17-601 and 19-602 are the two original grey JF17B prototypes

in 2020
14 x Jf17B + 2 x JF17 BlockA III

so 2P-73B to 2P-86B in 2020 we should see now anytime
and 2P-87B to 2P-90B - in 2021

plus now 3P-63 and 3P-64
 
Last edited:
highest serial was 19-612 which was 2P-72

in 2019 - 8 x JF17B in 2019 and 12 x JF17A Block II last one being 2P-62 Block II

17-601 and 19-602 are the two original grey JF17B prototypes

in 2020
14 x Jf17B + 2 x JF17 BlockA III

so 2P-73B to 2P-86B in 2020 we should see now anytime
and 2P-87B to 2P-90B - in 2021

plus now 3P-63 and 3P-64
Can u simply tell how much units we have so far...n secondly how many assembly lines work parallel n third was if one batch completes its testing by so far how much work completes to new ones...

Thnks in advance
 
Can u simply tell how much units we have so far...n secondly how many assembly lines work parallel n third was if one batch completes its testing by so far how much work completes to new ones...

Thnks in advance
I dont think the information about the number of jigs is available in public domain. 20 units were built in 2019. 12As plus 8 Bs
In 2020 16units including 2 block 3 units will be done. So 14 Bs
2021 14 units 2 Bs plus12.
A
 
Last edited:
So how many we have in our inventory till today...i think 8 jfb was handed over in December...definitely assembly lines were busy when PAC handed new planes...can anyone explains...at a time how many can be assembled.n how much time is required for one plane...assembly lines works parallel ...plz some explain
Why u t so curious of capacity and induction ? Who r u ?
 
Why u t so curious of capacity and induction ? Who r u ?
i want them in numbers...when ever a new squadron comes...it makes me very happy...but due to short memory loss n heavy work load n other stuff i cannt remember the no we hve produced...
Who am i...a muslim..n then a Pakistani

I dont think the information about the number of jigs is available in public domain. 20 units were built in 2019. 12As plus 8 Bs
In 2020 16units including 2 block 3 units will be done. So 14 Bs
2021 14 units 2 Bs plus12.
A
If 20 units were built in 2019. I think they will produce the same numbers atleast...my sixth sense tells they placed other chinese version of Aesa radar... in B model.
 