In a related/unrelated news. It’s seems indigenous power reactor of 340MW capability has been achieved or is close to be achieved. While not directly related, shows that the domain is being worked upon:FYI the nuclear submarine
BR-ePaper | Apr 13, 2022 | Page Analyses and Comments Page 13
epaper.brecorder.com
“To this end, by March 2022, six power plants (four at Chashma and two at Karachi) have begun contributing around 3500 MW of base load electricity to national grid. To meet future targets, preliminary work planning is under way for C-5 project (1100 MW), Chashma Engineering Complex (Fuel Fabrication Plant) and Indigenous Nuclear Power Plant (340 MW). These are to be funded by revenues from operating plants and Chinese loans.”