But if it was indeed an "old" report from September, isn't it then highly likely that Ruby 1 & 3 are already finished ??
How long does PAC in general needs to manufacture one JF-17 ?
Deino
The R units were at the structural buildup shop
The 32nd Block II was more advanced than the Ruby units it was getting its front fuselage joined with the Middle and rear fuselage
After this workshop they moved to final assembly
Then to flight testing
The Ruby units by now therefore must be either at final assembly or flight testing
I would guess we see them soon
Any more details on the crash it was from no 16 squadron using Block I?
Which serial ??
10-127 crashed in 2011 about 5 years ago