What's new

JF-17 Thunder Multirole Fighter [Thread 4]

Status
Not open for further replies.
The aircraft for 3rd squadron are ready and at PAC undergoing testing. I think it is due to be stood up in March this year.....and two more squadrons later this year....from what i have heard...

the raising of the 3rd squadron is delayed slightly - around April - June slot. the other rumour / news is that the new ACM will be chief guest at the 3rd squadron raising, Karachi / Masroor perhaps!
 
14 each would make only 28 planes in the first two squadrons. If there are 38 or 40 planes altogether in the 2 squardons then each sqd would have 19 to 20 planes. Right?

Oh yeah, sorry. There are around 19 units in each squadron. Just a error in calculation. :)
 
the raising of the 3rd squadron is delayed slightly - around April - June slot. the other rumour / news is that the new ACM will be chief guest at the 3rd squadron raising, Karachi / Masroor perhaps!

But how many squadrons are due this year then? 2 or 3?
 
But how many squadrons are due this year then? 2 or 3?

with the blk-II production slated for a june start, expect at least 1 sqdn of the blk-II to be raised by end of this year. so in total there shd be 4 squadrons by end 2012 (64-72 a/c). half way there.

---------- Post added at 10:20 AM ---------- Previous post was at 10:19 AM ----------

Oh yeah, sorry. There are around 19 units in each squadron. Just a error in calculation. :)

there is no hard and fast rule. 16-18 a/c is the norm but sometimes there are 12-14 also. just depends on availability.
 
with the blk-II production slated for a june start, expect at least 1 sqdn of the blk-II to be raised by end of this year. so in total there shd be 4 squadrons by end 2012 (64-72 a/c). half way there.



What is a current production rate of JF17 ??? cause for 1 squadron in 6 months you need rate more than 30 per year
 
What is a current production rate of JF17 ??? cause for 1 squadron in 6 months you need rate more than 30 per year

current rate is 24/year, set to increase to 30/year in 2013.
 
fatman bro
4 questions i want to ask

1) does blk 2 & 3 would have chinese indigenious engines?

2) Any information about chinese avionics & ECM in jf 17 block 2?

3) SD 10 b/ pl 12 b is going to be inducted in JF 17 block 2 & 3?

4) whats the name of chinese aesa radar which u r stating to be inducted in JF 17 block 2 & 3? if any extra information u could
give that may be helpful .
 
Posted by mandrake of CDF. Can someone please help with translation with fuller details. It is the article tphuang posted the highlights last week. Thanks.

Bigger image here: http://imgur.com/eQZeu

zm74l.jpg
 
fatman bro
4 questions i want to ask

1) does blk 2 & 3 would have chinese indigenious engines?

2) Any information about chinese avionics & ECM in jf 17 block 2?

3) SD 10 b/ pl 12 b is going to be inducted in JF 17 block 2 & 3?

4) whats the name of chinese aesa radar which u r stating to be inducted in JF 17 block 2 & 3? if any extra information u could
give that may be helpful .

@1 - russian for the time being - chinese poweplant still a few years away.
@2 - that info is already detailed in this or the JFT information pool thread.
@3 - SD-10A already integrated starting from blk-1
@4 - is blk-2 going to have aesa? - probably KLJ series radar.
 
with the blk-II production slated for a june start, expect at least 1 sqdn of the blk-II to be raised by end of this year. so in total there shd be 4 squadrons by end 2012 (64-72 a/c). half way there.
Third squadron of Block I to be operational within two months.
there is no hard and fast rule. 16-18 a/c is the norm but sometimes there are 12-14 also. just depends on availability.
I was mentioning in regards to the serial numbers :)
fatman bro

4 questions i want to ask

1) does blk 2 & 3 would have chinese indigenious engines?
Block 3, most likely. There were rumors WS-10/WS-13 for Block II but, there is a large stockpile for RD-93 so it seems that RD-93 would be used by Block II.
2) Any information about chinese avionics & ECM in jf 17 block 2?
Avionics? That part is done by Pakistan Aeronautical Complex. Most of the avionics is produced at PAC.
3) SD 10 b/ pl 12 b is going to be inducted in JF 17 block 2 & 3?
Any doubts, after it is operational on Block I?
4) whats the name of chinese aesa radar which u r stating to be inducted in JF 17 block 2 & 3?
AESA on block II? Highly unlikely, but let's see what surprise PAC has to give us this July.
There is no 'JF-17 Block 3' or 'JF-17 Stealth'... well not anymore.. the project is still there, but it's given a new name.
 
Status
Not open for further replies.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom