What's new

ISRO gearing up for second prototype test of RLV-TD

ashok321

ELITE MEMBER
Joined
Nov 1, 2010
Messages
17,942
Reaction score
4
Country
Canada
Location
Malaysia
4_img117717100303.jpg


Source Link: CLICK HERE

THIRUVANANTHAPURAM: A little over a year since the successful flight test of the first prototype of the futuristic Reusable Launch Vehicle - Technology Demonstrator (RLV-TD), ISRO is gearing up for a second go. Only this time, the prototype will ‘land’ on land instead of water.

Work is progressing at the Vikram Sarabhai Space Centre (VSSC) here on the second RLV-TD. A senior officer associated with the project said the RLV-TD will almost be a ditto version of the first scaled-down RLV-TD with the only exception being it will have landing gear.

ISRO sources said it may take another year for the model to be ready. They said the present plan is to launch the RLV-TD from Sriharikota and land it on an undisclosed Air Force airfield in the eastern sector. This is yet to be finalised though, they said.

ISRO.JPG


The unmanned RLV-TD comprises a space shuttle-like component fitted atop a booster rocket. The first RLV-TD weighing 1.5 tonnes, was successfully launched from Sriharikota on May 23 last year and splashed down in the Bay of Bengal from a height of 64.8 km.

While VSSC is primarily responsible for building the RLV-TD, the navigational equipment are being provided by the ISRO Inertial Systems Unit in Thiruvananthapuram and ISRO’s Satellite Applications Centre, Ahmedabad. Hindustan Aeronautics Ltd is responsible for the landing gear.

In fact, ISRO plans a series of TDs before attempting to build a fully-fledged vehicle that can be reused for launching satellites. A subsequent TD will possibly involve a slightly larger vehicle which will place a nano-satellite in the orbit.

vehicle_configuration.jpg



45770273.cms



1c33.jpg



India-Reusable-Launch-Vehicle-Technology-Demonstrator-RLV-TD.jpg



rlv-td-5.jpg



RLV_TD_Space_Vehicle.jpg
 
. .
Yet to construct the runway at Sriharikota. May be Arakkonam naval air station can be used.

Thank you for screwing it up as usual, pen pushers !!!
 
. .
http://googleweblight.com/i?u=http:...for-second-prototype-test-of-rlv-td/&hl=en-IN
A little over a year since the successful flight test of the first prototype of the futuristic Reusable Launch Vehicle – Technology Demonstrator (RLV-TD), ISRO is gearing up for a second go. Only this time, the prototype will ‘land’ on land instead of water.
Work is progressing at the Vikram Sarabhai Space Centre (VSSC) here on the second RLV-TD. A senior officer associated with the project said the RLV-TD will almost be a ditto version of the first scaled-down RLV-TD with the only exception being it will have landing gear.
ISRO sources said it may take another year for the model to be ready. They said the present plan is to launch the RLV-TD from Sriharikota and land it on an undisclosed Air Force airfield in the eastern sector. This is yet to be finalised though, they said.
The unmanned RLV-TD comprises a space shuttle-like component fitted atop a booster rocket. The first RLV-TD weighing 1.5 tonnes, was successfully launched from Sriharikota on May 23 last year and splashed down in the Bay of Bengal from a height of 64.8 km.


While VSSC is primarily responsible for building the RLV-TD, the navigational equipment are being provided by the ISRO Inertial Systems Unit in Thiruvananthapuram and ISRO’s Satellite Applications Centre, Ahmedabad. Hindustan Aeronautics Ltd is responsible for the landing gear.
In fact, ISRO plans a series of TDs before attempting to build a fully-fledged vehicle that can be reused for launching satellites. A subsequent TD will possibly involve a slightly larger vehicle which will place a nano-satellite in the orbit.
 
. .

Country Latest Posts

Back
Top Bottom