VEVAK
SENIOR MEMBER
- Joined
- Oct 24, 2013
- Messages
- 2,406
- Reaction score
- 1
finally we got a date for Qaher 313, taxi tests of the 1:1 model, before the end of current Iranian year which ends mar 2017.
Don't put your hops on the Qaher-313 it is nothing but a technology demonstrator and in no way will it be superior to the Saegheh fighter.
IRGC is wasting it's time! Rather than building a working prototype of a flawed design they should be working on improving the design to make it more viable!
1st remove all the flaws for example the wings(shouldn't be slanted), relocate air intakes(Under wing), smaller and fully movable frontal canards and a fly by wire system....
2ndly they should build a twin engine version (~ 20K lbf each) ! They should 1st work on building a small working prototype based off 2 owj engines and if successful they can later work on building a larger version with internal weapons bay with larger more powerful engine
Finally they need to accept the fact that if they want a viable fighter they need titanium and this idea that they can produce a cheap easy to produce viable fighter without it is nothing but a dream...
If it was me I would sack the program and look more towards improving the sofreh mahi design