What's new

Iran's Infrastructure projects...

Including how you introduce new statements on the go, falsely claiming to have made them earlier.


In other words you have no point.


By definition something that hasn't materialized in the real world is not factual.
in short you can't cope with truth and prefer to just made some nonsense post
Treason is a political concept in the first place. And working for foreign enemies constitutes treason in every political acception of the term.
no its legal than political.
 
Many of Iranians left because of his trolling

Please ban him from writing in sticky threads
no , i was here and i made the exact same post since 2012
the dates of you and your like minded friends entering the forum is visible for everyone to see and the date that Iranian members left the forum is also can be determined easily.
Iranian left forum after you guys came and polluted it with your childish post and start harass them and targeted them .
they left after you and guys like you began the name calling nonsense and campaign of harassment .
 
no , i was here and i made the exact same post since 2012
the dates of you and your like minded friends entering the forum is visible for everyone to see and the date that Iranian members left the forum is also can be determined easily.
Iranian left forum after you guys came and polluted it with your childish post and start harass them and targeted them .
they left after you and guys like you began the name calling nonsense and campaign of harassment .

Go take your medicines you useless (voice of israel) housefly troll
 
Iran's new "RAZI" border terminal with Turkey..
fb467cd8-a0fa-4bdf-b257-3a04d971605a.jpg

  • The three-story terminal can process passengers and goods 24 hours a day and in three shifts.
  • Construction of the Razi Border Terminal started in 2019 and has cost more than $25 million dollars
  • Time needed to process passengers travelling via the border between Iran and Turkey would drop from an average of three hours to 15 minutes
  • This Terminal will boost bilateral trade between Iran and Turkey amid plans by the two countries to meet a $30 billion target in their annual exchanges.

 

President Raisi inaugurates numerous energy projects in central Iran

1688200403143.png


TEHRAN – Iranian President Ebrahim Raisi inaugurated several water and electricity projects in Kerman Province during a one-day visit to the province on Friday, IRIB reported.

A project to supply drinking water to the cities of Bam and Baravat was one of the inaugurated projects.

Over 15 trillion rials (about $30 million) was invested to complete this water pipeline project, which has the capacity to transfer 1,000 liters/per second of water to the mentioned cities.

A thermal power plant with a total investment of 160 trillion rials (about $319 million) and several electricity transmission lines were also among the inaugurated projects.

Several projects were also inaugurated for the development, construction, modification, and optimization of the province’s electricity network to provide electricity to more than 6,400 households.

 

Iran to earn $5b annually after launching South Pars phase 11

1688202149832.png


TEHRAN, Jun. 28 (MNA) – Iran’s oil minister said that the South Pars phase 11 will generate $5 billion annually for the Islamic Republic of Iran.

Javad Owji made the remarks at the ceremony held on Wednesday on the occasion of the installation operation of the South Pars phase 11 platform.

Pointing to a 22-year delay in the development of this phase, the minister added its output will help reduce the gap between production and consumption of gas in the country, the oil ministry's news service SHANA reported.

The installation operation of SP Phase 11 platform was carried out by National Iranian Oil Company (NIOC), Pars Oil and Gas Company (POGC), Petropars Company, and Iranian Offshore Engineering and Construction Company (IOEC), he mentioned.

Based on the contract, French company Total was to get some $4.9 billion to develop Phase 11, recalled Owji, adding the company withdrew and missed the opportunity, as the project was implemented amid sanctions by Iranian experts.

President Seyyed Ebrahim Raeisi will inaugurate the SP Phase development project soon, said Owji, adding gas production from Phase 11 will be up to 15 million cubic meters per day (mcm/d) in the first stage and will gradually reach 50 mcm/d.

Phase 11 was the only undeveloped part of South Pars joint field and the other side [Qatar] kept extracting gas during the delay in implementing the development project in Iran, he regretted.

Owji said his ministry has carried out prioritized projects, including inauguration of Abadan Refinery Phase 2, inauguration of Phase 14 refinery, inauguration of the first phase of NGL 3200 plant in Hoveyzeh, and installation of Phase 11 platform.

 
UPDATE: to Tehran_shomal freeway mega project

Section 2 of the "Tehran- shomal" freeway construction is now progressing further.,Section 2 and 3 are the most difficult . In this section 70% of the freeway is all tunnels and bridges. 59 tunnels and 30 bridges just on this section alone.

Bridge 23 and 24 being constructed
View attachment 863852

View attachment 863850
View attachment 863851
View attachment 863854
View attachment 863855
UPDATE # 3 (Iran's largest freeway mega project):

Outbound lanes of segment 2 of TEHRAN-SHOMAL freeway inaugurated today by the president Raisi.

Segment 2 (most difficult and challenging segment is 16,5 km and is 93 % all mountains ..59 tunnels and 30 bridges just on this section alone and includes West Asia's longest tunnel ALBORZ.

R-8.jpg
R-0.jpg
R-3.jpg
R-1.jpg
R-4.jpg
R-6.jpg
R-5.jpg
R-10.jpg
R-11.jpg
R-9.jpg
R-12.jpg
 
A good day for Iran's infrastructure projects! :cheers:

Iran's second "intelligent"supper hospital "Ghadeer" is about to start formal operations

  • 13 story earthquake proof building with heliport facilities
  • 821 beds o_O
  • Main trauma center for Tehran
  • Main brain surgery center of Iran
  • Includes 24"intelligent" ORs
  • designated also for International heath tourism.
Ghadeer_1.jpg
GH-2.jpg
GH-3.jpg
GH_4.jpg
GH-5.jpg
GH-6.jpg
GH-7.jpg
GH-8.jpg
GH-9.jpg
GH-10.jpg
GH-12.jpg
GH-13.jpg
GH-14.jpg
GH-15.jpg
GH-10.jpg
 
Last edited:
Massive "Gachsaran" petrochemical plant inaugurated
  • 100% Iranian designed and built (70 Iranian firms in terms of designing, building, and installing vital necessary equipment.
  • Gachsaran is the first polyolefin unit (in Iran) with domestically designed furnace burners,
  • Gachsaran Petrochemicals will rely on 1.25 million mt per day of ethane gas as its feedstock. The gas will be supplied to the plant through a 90-kilometer pipeline from Bidboland Gas Refinery (flare gas), located in the nearby Khuzestan region.
  • At $ 1.43 billion dollars investment this plant will increase Iran's Ethylene production by more than 10%
  • 10 years to design and build.creates 1000 direct and 3000 indirect jobs.
PETRO_1.jpg
PETRO_2.jpg
 
Last edited:
"Chamshir" West Asia's tallest RCC dam and power plant inaugurated
  • Roller Compacted Concrete (RCC) construction
  • 482 Megawatts hydro power plant
  • This dam and the associated power plant are Iran's largest hydroelectric dam project in recent years
Dam_0.jpg
Dam_1.jpg
Dam_2.jpg
Dam_3.jpg
Dam_07.jpg
Dam_4.jpg
Dam_6.jpg
Dam_07.jpg
Dam_08.jpg
 
https://www.argusmedia.com/en/news/2475502-first-gas-from-irans-south-pars-phase-11-imminent
First gas from Iran's South Pars phase 11 imminent

Iran will begin producing gas from the long-delayed phase 11 of the giant offshore South Pars field in the Mideast Gulf next week, oil minister Javad Owji said on Wednesday.

"This is the final offshore phase of South Pars, which was implemented from start to finish by this administration," Owji said. "We will begin producing between 12mn-15mn m³/d of gas at this phase from next week."

The start of production from phase 11 will mark a key milestone for Tehran given the numerous obstacles the country has faced over the past decade to bring the politically-charged project to fruition. In the early 2000s, Iran's state-owned oil company NIOC was in discussions for several years with TotalEnergies, then Total, to develop phase 11, which resulted in the signing of a preliminary non-binding agreement. Disagreements over contract terms saw Total withdraw from the project, only to be replaced by China's state-owned CNPC, which was awarded a $4.7bn contract in 2009.

Years of foot-dragging and minimal progress ensued, culminating in Iran terminating the contract with CNPC in 2012. The project was then transferred to NIOC subsidiary Petropars, but a lack of access to financial resources and foreign partners, in large part due to US and UN sanctions, prompted Iran to put the project on ice.

The signing of the Iran nuclear deal in 2015 and the subsequent lifting of sanctions gave the project a new lease of life. Tehran re-entered into negotiations with TotalEnergies and CNPC, which led to the signing of a $4.88bn deal in the middle of 2017 ꟷ Iran's first major upstream contract award since the signing of the nuclear deal. But both companies were forced to pull out after former US president Donald Trump withdrew the US from the nuclear agreement and reimposed sanctions on Iran. TotalEnergies exited the project in August 2018, followed by CNPC in October 2019.

Phase 11 has been under Iranian control since, with Petropars awarded operatorship of the project. The Iranian firm began phase 11 drilling in December 2020.

The 12mn-15mn m³/d production guidance given by Owji today represents a slight upgrade to an earlier 11mn-14mn m³/d target issued by NIOC managing director Mohsen Khojasteh-Mehr. The original plan envisaged production almost doubling to just over 10bn m³/yr in a second phase. At capacity this would represent a near 4pc addition to Iran's gas production, which stood at 259.4bn m³ in 2022, according to the latest Statistical Review of World Energy.

Iran shares the South Pars field with Qatar, where it is known as the North Field — the centrepiece of Qatar's massive LNG production expansion plans.

By Nader Itayim
 
4 million ( approximate cost $100 billion dollars) low cost "National Housing Movement" and I am Keeping a close watch on this mega project . Construction of 1.2 million unit has started, 200,000 units are in new towns..and some are supposed to be delivered end of Aug.. :cheers:

200,000 National Housing Movement units under construction in new towns​

  1. Economy
August 2, 2023 - 12:56


TEHRAN- The managing director of New Towns Development Company said that 200,000 National Housing Movement units under are construction in new towns throughout the country.
Alireza Jafari also announced that the first National Housing Movement units in new towns will be inaugurated during the Government Week (starting August 24).
Back in June, Transport and Urbana Development Minister Mehrdad Bazrpash announced that 1.25 million units of the National Housing Movement plan are under construction in the country.
The minister also said that 3,000 hectares of land have been allocated to this plan so far.
After National Housing Action Plan (started in 2018), National Housing Movement is the government’s second major program to provide affordable housing units for the low-income classes.
The operation for the construction of 209,212 residential units of the National Housing Movement began in February 2022.
The ceremony to begin the mentioned operation and also to launch some development projects in the housing sector was attended by former Transport and Urban Development Minister Rostam Qasemi.
Also, in July 2022, the minister inaugurated a project for the construction of the first group of affordable housing units for laborers under the framework of the National Housing Movement.
 
Last edited:
Back
Top Bottom