What's new

Iran’s Army plans to procure 800 Karrar advanced battle tanks

.
Currently Karrar is being tested in different climates, if finish successfully, it will become operational.

تولید جنگنده «کوثر» به صورت تصاعدی افزایش می‌یابد
Lol
معمولاً در حوزه ساخت اینگونه تجهیزات که از فناوری پیچیده ای برخوردار است و در سالهای اول تکمیل زیرساخت ها را به همراه دارد، تعداد کمتری ساخته می شود اما در سالهای بعدی قطعاً با حمایت دولت، این روند به صورت تصاعدی بالا می رود و تعداد قابل توجهی ساخته و به ناوگان هوایی کشور الحاق می شوند.

let me translate it , we have limited budget , in future year if government provided us with enough Budget then we can increase the production output.
 
.
Lol


let me translate it , we have limited budget , in future year if government provided us with enough Budget then we can increase the production output.

Iran has the technology, this is important, but yes, due limited budget it will be not YET massproduced.
Russia has the T-14, but its not YET massproduced, because its NOT YET needed, modernized T-90 are more than sufficient against western counterparts, why wasting money?
What is bigger deterrant...hundreds of Karrar tanks or ballistic missiles?
Irans priorities are -> missiles, air defence, UAVs & navy, time for karrar will come, if needed it will be produced
 
.
Iran has the technology, this is important, but yes, due limited budget it will be not YET massproduced.
Russia has the T-14, but its not YET massproduced, because its NOT YET needed, modernized T-90 are more than sufficient against western counterparts, why wasting money?
What is bigger deterrant...hundreds of Karrar tanks or ballistic missiles?
Irans priorities are -> missiles, air defence, UAVs & navy, time for karrar will come, if needed it will be produced
that part is about kowsar not karrar
 
. . . .
Most Iranians are waiting for the F-313 and its variants to take to the skies. Nothing is more important than this at the moment. Maybe Soheil knows some update.
even if it fly this year it will not enter mass production any time soon. first it will perform the first fly and after that the test pilot will share his thoughts about the performance of plane with the design group. if any flaw detected it will resolve and after that they will start to integrate it's weapon systems and again test pilot will examine new systems and will indicate the drawbacks to group. after all this the AF would consider the platform useless or sufficient for its needs. this whole would take time at least 3 years. but first fly is a good news.
 
.
everybody waiting bro......its been a long time.......this thing must fly soon.

even if it fly this year it will not enter mass production any time soon. first it will perform the first fly and after that the test pilot will share his thoughts about the performance of plane with the design group. if any flaw detected it will resolve and after that they will start to integrate it's weapon systems and again test pilot will examine new systems and will indicate the drawbacks to group. after all this the AF would consider the platform useless or sufficient for its needs. this whole would take time at least 3 years. but first fly is a good news.
 
. . .
Pictures from the inside of the karrar tank

D1Yp1N6XQAAufDB.jpg


D1Yp2mVXcAI3Jcp.jpg


D1Yp3vwWsAUyjeT.jpg


D18bbU0X4AANfYS.jpg
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom