aryobarzan
SENIOR MEMBER
- Joined
- Feb 17, 2019
- Messages
- 4,586
- Reaction score
- 1
- Country
- Location
To carry out such a massive mega project , iran had to do the following:
Research the special steel alloy required to carry corrosive crude oil..they named it "sour steel".
Steel mill in Isfahan had to produce the steel alloy in the form of sheet with exact thickness.
Steel sheets had to be rolled into pipes and coated.
1000 km of trenches had to be dug out in 40 degrees heat.
Pipes placed ,connected,welded,tested.
Pumping station put in place.
Terminals built..storage tanks built..
Such a feast of an engineering for a country under total embbargo due to sanction.
My salutes to iranian men and women who are doing this mega project and F***k the Israeli and Arab fan boy....have a nice day!
Research the special steel alloy required to carry corrosive crude oil..they named it "sour steel".
Steel mill in Isfahan had to produce the steel alloy in the form of sheet with exact thickness.
Steel sheets had to be rolled into pipes and coated.
1000 km of trenches had to be dug out in 40 degrees heat.
Pipes placed ,connected,welded,tested.
Pumping station put in place.
Terminals built..storage tanks built..
Such a feast of an engineering for a country under total embbargo due to sanction.
My salutes to iranian men and women who are doing this mega project and F***k the Israeli and Arab fan boy....have a nice day!