What's new

INS Vikrant unlikely to be battle-ready before 2020

In reality, Vikrant is still an uncomplete empty hull that is already 4 years behind schedule. So when Indians tell you it will be ready by 2018 its safe to assume it will never be ready by then.
 
.
In reality, Vikrant is still an uncomplete empty hull that is already 4 years behind schedule. So when Indians tell you it will be ready by 2018 its safe to assume it will never be ready by then.

And your Lianoning still floats without an aircraft complement. Even Vicky will get the already comissioned Panther squadron.
 
.
we prefer results rather than like the feudal Gandhi family's empty boasts,
You mean you don't declare dates or deadlines before achieving something? Wow. Only direct descends of superman can do it. Gandhi family is not part of this superman genes. You see, its not their fault.

there is a reason that why after 60 years of 'development' India is still at primitive stage of social and economical development
I am sure you must be feeling very good after writing this. I am expecting some edition to these statements in your next reply. All the best.
 
. .
And your Lianoning still floats without an aircraft complement. Even Vicky will get the already comissioned Panther squadron.

I guess Indians like to turn on the blind eye to the J15 thats been flying and landing on the Liaoning. What you don't see don't exist m i right?
 
.
I guess Indians like to turn on the blind eye to the J15 thats been flying and landing on the Liaoning. What you don't see don't exist m i right?

well i guess u have turned on a blind eye that india is operating aircraft carriers from last 5 decades + vikrmaditya very frequentli gets MIG 29 ks on board
images


and one more thing your Lioning or what ever you call it was a scrap metal casino which has russian engines , asserter machenism , elavators and close in wepon systems and the J15 which you bost of is nothing but a cheap chinese copy of the russian SU 27 family which you have reversed ingeneared = which means you dint had an orignal design or build something from grounds up

and you are commenting indians on turning a blind eye what a joke :omghaha:

That's there. But why are PSUs so slow?

I want to know the real answer. Bureaucracy is general reply.
well not just beurocracy but the lathargy of the GOVT in power during NDA rule SU 30 MKIs was conceputlised and work on Pinaka ,tejas and arjun were speeded up advance jet trainer and groshkov deal were done both of which were delebratelli messed up by the congress govt

hope u get the point sir
 
. . .
Well there is a lot of work to be done. But asking for 7 years is too much.

IN should aggressively demand it to be ready by 2017 at least.

2017. If the official announcement is 2020, expect further delays. IN would be fortunate to get this light weight AC by 2020.

In reality, Vikrant is still an uncomplete empty hull that is already 4 years behind schedule. So when Indians tell you it will be ready by 2018 its safe to assume it will never be ready by then.

You are correct, if the ETA is 2020. Expect 3-5 year delay. If it happen by 2020, than India is lucky.
 
.
2017. If the official announcement is 2020, expect further delays. IN would be fortunate to get this light weight sub by 2020.



You are correct, if the ETA is 2020. Expect 3-5 year delay. If it happen by 2020, than India is lucky.

It's not a submarine idiot. At least know what the discussion is about.
 
. .
2020 is for the ever-so-optimistic Indians.

2025 is for those who know Indians can't even have their Kolkatas done in 10 years。

2030 if the multitude foreign suppliers decide to hike prices for whatever reasons。:azn:
 
.
2017. If the official announcement is 2020, expect further delays. IN would be fortunate to get this light weight AC by 2020.



You are correct, if the ETA is 2020. Expect 3-5 year delay. If it happen by 2020, than India is lucky.

Got any thing to substantiate your claims?
 
.
2020 is for the ever-so-optimistic Indians.

2025 is for those who know Indians can't even have their Kolkatas done in 10 years。

2030 if the multitude foreign suppliers decide to hike prices for whatever reasons。:azn:

troll_or_just_stupid.jpg
 
.
2017. If the official announcement is 2020, expect further delays. IN would be fortunate to get this light weight AC by 2020.



You are correct, if the ETA is 2020. Expect 3-5 year delay. If it happen by 2020, than India is lucky.

It may be possible. 2020 is an estimate here. Although CSL has worked well despite the delays unlike DRDO which is a different and a very infamous entity for terrible delays.
 
.
Back
Top Bottom