With a combined shaft power of.......?Likely just an enhanced version of current Liaoning AC, which is almost identical to 001A and propelled by Chinese engines, too.
Would this help? https://en.wikipedia.org/wiki/Chinese_aircraft_carrier_LiaoningWith a combined shaft power of.......?
So steam turbines for the 001A? Not the RO101 Gas Turbine?
Few people know the details. The performance should be similar between the two.So steam turbines for the 001A? Not the RO101 Gas Turbine?
^ pics from late 2015
So steam turbines for the 001A? Not the RO101 Gas Turbine?
Indeed, I had seen that I'm just wondering about the combined output for the 001A (as I don't read Mandarin )
As for the J-15, I understand it is the only choice the PLA(N) have but it is far from ideal.
It will be HEAVILY pitched to India but I would rule it out (as we stand today).
No no, 2023....CAG told me so
@PARIKRAMA what did I say bro?
@anant_s @Ankit Kumar 002 @Roybot @Vergennes @MilSpec @nair @SpArK @Joe Shearer @acetophenol @Water Car Engineer
Point 1-@Abingdonboy @PARIKRAMA
It looks quite certain now that IAC 2 onwards IN ACs will feature EMALS and heavier fixed wing air crafts.
That means (even conservatively speaking) we are looking at 60,000+ Ton displacement ACs. So 2 questions here:
As per this article, by 2018 IAC 1 will leave its construction dock and head for testing and commissioning. So a berth becomes available for next boat. If funding is not an issue now, the time frame mentioned indicates, the next AC construction should start by 2019. How ready are we?
- Is it now given that we will have N powered ACs?
- Who is helping us out in design of such a behemoth and subsequent construction?
Apart from the hull which was originally slated to use Russian steel, I am not sure what is actually Indian about the ship. Maybe the welders welding the ship together?In quantity but not quality and in the long run India is only going to close the gap to China (militarily and economically).
I think it's better to let you guys live in bliss and fantasy.China has EMALS tech that will deployable in the near future?
Wouldn't that necessitate nuclear power?
Apart from the hull which was originally slated to use Russian steel, I am not sure what is actually Indian about the ship. Maybe the welders welding the ship together?
http://timesofindia.indiatimes.com/...ion-deficiencies-CAG/articleshow/53400187.cms
Read this, cost overruns, Mig-29 problems, and induction only around 2023.
Btw, the Vikrant is based on the Kiev class whose design China abandoned in favour of the Kuznetsov.. Even the Russian decommissioned the last Kiev class years ago. Mig-29 is not the first choice for the Kuznetsov but due to it's smaller size, there are considering a mix wing.
Vikrant is a 40K class based on Kiev
001A is a 60K class carrier based on Kuznetsov
I think it's better to let you guys live in bliss and fantasy.
But there is also a limitation of N fuel being available as priority needs to be given to 6 SSN which will be expanded to 12 later and 5 SSBN which will be eventually made 10 especially the last ones sporting 12+ silos meaning heavy tonnage and probably a 190MW class reactor...