What's new

INS Arihant heading for sea trial in 2 days!!

nik22

FULL MEMBER
Joined
Aug 17, 2013
Messages
930
Reaction score
-1
Country
India
Location
India
Indigenous nuclear powered submarine INS Arihant to head out for sea trials

Sandeep Unnithan New Delhi, Saturday, December 13, 2014
arihant-story_350_121314032445.jpg


India's quest for a secure seaborne nuclear deterrent is set for a giant stride when its first indigenously constructed nuclear submarine the INS Arihant begins sea trials next week.

Naval sources indicated a casting-off date of Monday, December 15, and preparations are currently underway at the Shipbuilding Centre, Visakhapatnam to ensure a smooth sail out for the 6,000-tonne nuclear powered ballistic missile submarine (SSBN).

"It will be a surfaced sortie, but a great milestone nevertheless," naval officials told India Today.

It has been a slow crawl for the Arihant since she was launched at the shipbuilding centre in Vizag on July 26, 2009. It was four years before the next major milestone could be crossed, in August 2013 when the 83MW reactor onboard the submarine went critical.

Navy chief Admiral Robin Dhowan told mediapersons on December 3 that the submarine would commence its sea trials "very soon" and attributed the five-year time lag to the complexity of the platform and its equipment. Sources say the navy chief Admiral Dhowan wanted Prime Minister Narendra Modi to be present at the cast-off, but it failed to materialize because of scheduling reasons.

Naval officials say the sea sortie marks the first in a series of steps-submerged sea trials and weapon firing trials which the submarine will have to cover before she is ready for induction into the navy, a process which could take another year.

The navy plans a fleet of five SSBNs, all of them capable of firing nuclear-tipped ballistic missiles from under the sea. Two more Arihant class submairnes are being fabricated at the SBC in Vizag and are likely to be inducted over the next five years.

India currently operates one nuclear submarine, the INS Chakra (the ex Russian sub 'Nerpa') taken on a ten-year lease from Russia in 2012. One of the items on the agenda of recent summit-level talks between Russian President Putin and Prime Minister Narendra Modi is believed to have been the lease of a second SSN, the unfinished 'Iribis', left unfinished after the breakup of the Soviet Union.
 
. .
One of the items on the agenda of recent summit-level talks between Russian President Putin and Prime Minister Narendra Modi is believed to have been the lease of a second SSN, the unfinished 'Iribis', left unfinished after the breakup of the Soviet Union.
Well If it's true then why the hell we like to get Akula 1 improved than the Akula 2?
 
.
Gentlemen -

If this were True, I will Open a Champagne when k15 is tested from Sub...
 
. .
Well If it's true then why the hell we like to get Akula 1 improved than the Akula 2?

That would be primarily because there exists only one unfinished Akula hull available for completion (that too @ 60 % completed) at this moment. The other unfinished hulls were either scrapped or carved up for parts to build the Borei class SSBNs.

I'm not aware if could ask for a new akula II or even Akula III from the Russians though. It was they who first proposed the lease of K-152 and hull 519 to the IN.
 
. . . .

Pakistan Affairs Latest Posts

Back
Top Bottom