I AM 1000000000% PROUD TO BE PAKISTANIUpdate:
Newsletter From Emaar Pakistan
Stepping Up
Crescent Bay is on course to deliver the quality of life at par with the very best. Construction is pacing up day by day as Emaar promises to deliver your properties in 2011. We take it as our duty to share with you the current status of the progress in detail.
As per the recommendation of our consultants about 3000 piles were required to be casted for the residential plot No. 5, 7 & 8, each having a diameter from 760mm to 1000mm and depths of average 35 meters into the ground. The contract for the purpose was awarded to renowned construction contractors like Paragon Constructors (PVT) LTD and SKY Construction LLC.
Construction Facts at Crescent Bay Karachi
210,000 cubic meter of excavations
2,800 piles in reinforced concrete (3 feet diameter and 115 feet deep of which 15 feet inside hard rock)
80,000 cubic meter of concrete in piles
12,000 tons of steel bars to reinforce piles
140,000 square feet of raft foundations (8 feet high)
78,000 cubic meter of concrete in raft foundations
16,000 tons of steel bars in raft foundations
The process of drilling works involve reverse rotary boring up to the required depth, determined through detailed structural design carried out by internationally acclaimed consultants. Later stages involve, formation of high strength steel cage, lowering of cage in bored holes/logs to the entire depth and placement of concrete of required design strength to form an integral structural member known as Pile. All this work is under execution by specialized Engineers and Technicians, supervised by highly qualified professionals comprising our team of internationally acclaimed Consultants and Emaar Pakistans dedicated officials.
Future Plan
On conclusion of pile foundations work, Emaar Pakistan is planning to start work on sub structure comprising pile caps, rafts two level basements, ground floor and podium structures in September, 2009. All the requisite documentations / formalities for the tender process and award of Works are complete. The image on the top represents a typical cross-section of the building, to familiarize our valued customers with the design of RCC frame structure of the building, number of floors and to highlight its structural stability with the help of Pile Foundations.
HI GUYS DO YOU KNOW ANYTHING ABOUT PORT TRUST TOWER KARACHI? IS IT UNDER CONSTRUCTION?
It is too high. Very nice!
The first picture you quoted in your message is not of EMAAR'S CRESCENT BAY. It is of KARACHI WATERFRONT, a 60 billion dollar investment plan by Dubai based LIMITLESS which has recently been CANCELLED.
Its called Karachi Port Tower Complex and no, its not under construction yet.
Crescent Bay, Karachi
Why the faces of Musharaf and his tutoo companions on each side? Pakistan cannot be developed as long as tutoos like them rule pakistan.
Karachi Sofitel Hotel Tower & Mall
Current construction site:
Render: