What's new

Infrastructure Development in Pakistan

Multan metrobus package 1 ... vehari chauk to kumharawala chauk
 

Attachments

  • 1445970761313.jpg
    1445970761313.jpg
    67.1 KB · Views: 89
  • 1445970773592.jpg
    1445970773592.jpg
    48.5 KB · Views: 90
  • 1445970807661.jpg
    1445970807661.jpg
    98.2 KB · Views: 95
  • 1445970828935.jpg
    1445970828935.jpg
    55.1 KB · Views: 83
  • 1445970863503.jpg
    1445970863503.jpg
    49.7 KB · Views: 82
.
2 x 2.5 MW hydel project ... chashma...mianwali
 

Attachments

  • 1445970944071.jpg
    1445970944071.jpg
    85.5 KB · Views: 83
  • 1445971023191.jpg
    1445971023191.jpg
    80.5 KB · Views: 83
  • 1445971067001.jpg
    1445971067001.jpg
    83.7 KB · Views: 83
  • 1445971132121.jpg
    1445971132121.jpg
    83.7 KB · Views: 85
  • 1445971153812.jpg
    1445971153812.jpg
    98.5 KB · Views: 95
.
Jail Road Signal Free Project, Shadman Underpass and road are near completion.

12193857_1189438251070661_5777249535902490574_n.jpg



Pictures of Bahria Palisades Apartments Project Islamabad
12187855_1189392744408545_9017370126297642813_n.jpg


Somewhere in Baluchistan

lv9SfZY.jpg


Lahore Orange Line Metro Package-1 Dera Gujjran to Chauburji

DSC_9979-5646-800-600-80.JPG

DSC_9495-5644-800-600-80.JPG

DSC_9441-5642-800-600-80.JPG

DSC_9448-5643-800-600-80.JPG

DSC_9950-5645-800-600-80.JPG
 
. . .
Peshawar Mor Interchange Islamabad

G9yJMKb.jpg

WCNnAhc.jpg


Karachi Hyderabad Motorway Work in progress

e0Dmd46.jpg


VgPYIwN.jpg


2GyE4lJ.jpg


Capital Development Authority (CDA) Roads up-gradation and rehabilitation Islamabad

Capital Development Authority (CDA) has started up-gradation and rehabilitation work in the entire city in the first phase of Islamabad rehabilitation and up-gradation plan. In this connection, road re-carpeting of major roads and avenues, installation of signboards, proper lane marking, fixation of curb stones, repair / maintenance of footpaths, provision and up-gradation of all civic amenities and aesthetic beautification of the city is being carried out to revamp and uplift the city. The development work is being executed simultaneously, on war footing basis, in the entire city.
Senior officers of the Authority are personally monitoring and supervising the development work to ensure quality and early completion of the project. During the first phase up-gradation work has been initiated in all residential and commercial areas of the Capital City simultaneously. Moreover, availability of required machinery and other resources has also been ensured. Furthermore, all parks in the city, particularly in thickly populated sectors are also being upgraded and more facilities are also being added to further facilitate the residents. In addition to this, beautification and landscaping of prominent intersections and chowks has also been started.
Furthermore, tendering documents for the second phase of Islamabad rehabilitation and up-gradation plan has also been prepared and practical work on the second phase would be started soon after the completion of codal formalities.
CDA management has directed all the formations of the Authority to complete the development work with quality and in line with international standards so that the beauty of the city could be restored and the residents of the Islamabad could facilitated.CDA management has reiterated that CDA is committed to provide quality services to the residents of the Federal Capital and no compromise in quality of the work would be tolerated. CDA management has further said that Islamabad up-gradation and rehabilitation plan has been envisaged to provide quality living to the residents and make the city more beautiful. CDA management has directed to ensure strict monitoring to ensure quality of the work



12107916_960198684022324_8530275224245669048_n.jpg



12108792_960198647355661_5981634516347529579_n.jpg
 
. . .
Lahore Orange Line Metro Train
Package-1 Construction of Civil and Allied Works from Dera Gujjran to Chauburji 13.6 KM


12109044_1191150844232735_7927152416400662150_n.jpg

11053050_1191151564232663_8514721109829130286_n.jpg

12193801_1191151707565982_7356151961873941411_n.jpg

12191511_1191152040899282_3678017619897565159_n.jpg

12079556_1191151854232634_5462651167941047814_n.jpg
 
. . . .
LAHORE Azadi Interchange Outer Circular Road Project


DSC_2837-5641-800-600-80.JPG

DSC_2831-5640-800-600-80.JPG

DJI_0028-5639-800-600-80.JPG

DJI_0016-5637-800-600-80.JPG

DJI_0018-5638-800-600-80.JPG

DJI_0011-5636-800-600-80.JPG

DJI_0004-5635-800-600-80.JPG


Lahore Fort’s historic Picture Wall to be restored

lahore-fort-s-historic-picture-wall-to-be-restored-1445977539-9279.jpg


LAHORE: Walled City Lahore Authority (WCLA) and Aga Khan Culture Service Pakistan (AKCS-P) joined hands to restore Lahore Fort's historic Picture Wall and kicked off the architectural survey of the Picture Wall.

According to details, after the completion of the survey of one of the longest and largest mural of its kind, the physical restoration will be started. The Picture Wall depicts the Mughal era through pictures, fresco paintings, unique tile work, exceptional brick and tile patterns, architectural terracotta base and hence visuals, which cannot be found elsewhere in the world's architectures.

The project of the architectural survey is funded by the Royal Norwegian Embassy, Islamabad.

Wajahat Ali, senior conservation architect of Aga Khan Culture Service Pakistan, said while talking exclusively to Daily Times, "This architectural study has begun to examine patterns of the 800-metre historic Picture Wall. We are using 3D-scanners for the first time, previously a machine called the 'total station' used to examine in architectural surveys of historic buildings."

He said that by using 3D-scanners and other softwares, the Aga Khan Service Pakistan will efficiently finish the architectural study by June 2016. He said after western side examination, AKCS-P will submit a report to WCLA and separately publish a detailed brochure.

"The restoration of such rich-architecture work on the Picture Wall is a complete science. Meanwhile we are going to connect a historian too as each pattern of the Wall has its unique history," the project conservation architect added.

Geneva-based Aga Khan Trust for Culture local chapter in Pakistan works by the name Aga Khan Cultural Service Pakistan and has restored multiple historical sites including Mosque Wazir Khan and historic forts in Gilgit-Baltistan. All the restoration or architectural surveys in Lahore's Walled City by AKCS-P are conducted in corporation with WCLA.

The Picture Wall is depicted with animal, birds and royal recreation or with the royal court's activities. The scenes of polo games, animal hunts, trees and vegetation are also inscribed on it. The mural contains unique Pietra dura technique, which is an Italian technique of creating images on polished coloured stones.

WCLA Lahore Fort Deputy Director Asghar Hussain said that the documentation work of the Picture Wall had just begun in coordination with AKCS-P to account comprehensive and detailed study of the Wall. After that, the physical restoration of the Wall will begin.

It is pertinent to mention that the Picture Wall is the reason behind the inclusion of Lahore Fort into the world heritage monument in 1981. The picture wall at the Lahore Fort, built during 1624-32 during the era of Mughal emperor Shah Jahan, further enhanced the beauty of the historical site.

Tanvir Johar, working as a documentation specialist with the project, says each and everything of 100-metre Picture Wall is being documented and the research work will present the analysis of the material used in the making of it.
 
. . .

Pakistan Defence Latest Posts

Country Latest Posts

Back
Top Bottom