Infrastructure Development in Pakistan

Escalators and Elevators Installation on Pedestrian Bridges

WP_20150330_15_58_20_Pro.jpg
WP_20150330_16_23_43_Pro.jpg
WP_20150330_16_23_59_Pro.jpg
WP_20150330_17_18_10_Pro.jpg
WP_20150330_17_18_16_Pro.jpg
WP_20150330_17_18_22_Pro.jpg
WP_20150330_17_19_21_Pro.jpg
WP_20150330_17_19_27_Pro.jpg
 
. . .
. . . .
Command and Control Center of Metro Bus Service + Parking plaza . U/C. Saddar Rawalpindi.

11110144_1027836120564065_4907686023751341023_n.jpg

10447499_1027836110564066_8644170874850133867_n.jpg

11102961_1027836087230735_1678750664130336242_n.jpg

994484_1027836073897403_4118918314048390673_n.jpg



IJP Road and Stock Exchange Station

16523_1027606337253710_488088702522074321_n.jpg
11127073_1027606347253709_3296639534185336114_n.jpg
10955533_1027606147253729_3581046487559909910_n.jpg
10672202_1027415587272785_3354720030017525522_n.jpg
10347501_1027415627272781_5710862795345484206_n.jpg
 
. .
Pedestrian Street Sadar Rawalpindi (Name To Be Decided)
Closed for traffic. Gates will be installed on Entry & Exit. Food Street
Currently Bank Road


17994_1571949976424362_1034367791108729900_n.jpg
11083892_1571949979757695_3358457099334245326_n.jpg
11067136_1571949949757698_2120849808827733671_n.jpg


Lahore Orange Line Metro Train

603754_469441669877196_8550215902057035163_n.png


Mall Of Gulberg Lahore

16737038557_b1f2ef0736_b.jpg


Pink rickshaws driven by ladies in Lahore

11076231_365911040263339_2485205774372853572_n.png


U/C Imperial mall, Paragon City Lahore

10885245_465875586900471_7251104768735120539_n.jpg
 
. . . .
NHA has asked 5.8 billion rupee funds to build Lahore eastern By pass as part of Lahore sialkot motorway project.

Road will strart from shadbagh ring road, then a bridge on ravi river then interchange for Mughal gateway gardens then Interchange at Muredke Narang road where Lahore Sialkot motorway will join it then will end at Kala shah kaku.

13kms total length
100 meters width
1 bridge
4 interchanges

11094673_858297150910831_3803815475713824670_n.jpg


PUNJAB | Lahore-Sialkot Motorway
Prime Minister's office, Islamabad has directed NHA to undertake a detailed
feasibility study based on technical and financial analysis for construction of proposed
Lahore - Sialkot Motorway Project but not limited to the following alignment options;

Option-I: Sialkot to Lahore via Akber Abad Seoki (MR Link Crossing), Lohriki (BRB Crossing) Mianwali Bangla (Gujranwala-Pasrur Road) Gharyal Kalan Pakhiala Balkhay (Lahore Eastern Bypass), 110 km

Option-II: Sialkot to Lahore via Motra Seoki (MR Link Crossing), Lohriki (BRB
Crossing) Mianwali Bangla (Gujranwala-Pasrur Road) - Gharyal Kalan Pakhiala Balkhay
(Lahore Eastern Bypass), 108 km


Objectives of the Project
The Proposed Motorway is planned as a 4-lane limited access facility with bridges
over Canals, culverts as per NHA Standards. The Project is not included in PSDP 2014-15. It
is envisaged that Project may be financed through special Government funding or through PPP Mode.



Design
*Restricted access carriageway on both banks of BRB canal
*Total length: 110kms
*Carriageway Width: 7.6m (Three lanes (3.65+4) for main carriageway
*Designed Speed: 120kph

Travelling time will be reduced from 2 to one hour only.

I have tried to map it following the guidelines in RFP report.
11130186_858306384243241_5514951974760062179_n.jpg


Benazir Bhutto Int Airport Rawalpindi

CBbElXIUUAApanN.jpg

CBafVMiU0AAQiJy.jpg:large


Cattle Market in Sheikhupura

11058719_895450843826856_6494671833619402320_n.jpg
11082500_895450907160183_5209297380850772773_n.jpg
 
. .