Muhammad Omar
ELITE MEMBER
- Joined
- Feb 3, 2014
- Messages
- 13,558
- Reaction score
- 15
- Country
- Location
FWO Commences Work on Overlay and Modernization of Motorway (M-2) Project
RAWALPINDI Jan 19: Frontier Works Organization (FWO) on Monday has commenced work on overlay of Motorway (M-2) a mega Build-Operate-Transfer (BOT) project won by FWO. Lt General Khalid Asghar, Engineer-in-Chief, Maj General Muhammad Afzal, Director General FWO and Mr. Shahid Ashraf Tarrar, Chairman NHA besides senior officials of FWO and NHA witnessed the formal commencement of work on the project near Islamabad Interchange.
A comprehensive briefing encompassing the salient of construction zone, methodology to be adopted, equipment / human resource and dualization was given before start of work. It was highlighted that safety and security of the commuters and workforce were being accorded paramount importance besides ensuring uninterrupted flow of traffic causing minimum possible delay to the commuters. Traffic continuity will remain uninterrupted, and time management has also been given singular priority.
It is pertinent to mention here that the project will be completed in shortest possible time under a Build-Operate-Transfer (BOT) system that includes re-carpeting 337 km length, modernization of motorway facilities, repair and rehabilitation to enhance motorway life. Moreover, M2 has already been handed over to FWO for operation and maintenance for the next 20 years. Motorway was formally handed over to FWO by NHA on 15 Dec 2014 during an inaugural ceremony performed by Prime Minister Muhammad Nawaz Sharif.
Construction of road near Walton Station inaugurated
ISLAMABAD- Railways Minister Khawaja Saad Rafique has said that Government is taking all possible measures to overcome the shortage of petroleum products soon. Prime Minister has already suspended the concerned senior officers in this regard.
He was addressing the inauguration of work on a link road project in Lahore today. He said that Pakistan Railways has enough oil reserves for fourteen days, which will be increased up to thirty days with passage of time. He said that all possible measures are being taken for decreasing the losses and increasing the income of Pakistan Railways.
He said, green belt will be formed on both sides of rail track from Shahdara Lahore to Raiwand and all wastes will be removed from this area.
Railways Minister said that Baaba-e-Pakistan Project will be launched in Lahore this year, to pay homage to the migrants from India at the time of partition.
About the link road project, Khawaja Saad Rafique said that this one hundred million rupees project, will link area from Seven-up Railway Crossing to the Ferozepur Road in Lahore.
He said that this project will be completed within three months. Later, he inaugurated the work on the project.
At last, the final route to new airport link motorway via Top City.
RAWALPINDI Jan 19: Frontier Works Organization (FWO) on Monday has commenced work on overlay of Motorway (M-2) a mega Build-Operate-Transfer (BOT) project won by FWO. Lt General Khalid Asghar, Engineer-in-Chief, Maj General Muhammad Afzal, Director General FWO and Mr. Shahid Ashraf Tarrar, Chairman NHA besides senior officials of FWO and NHA witnessed the formal commencement of work on the project near Islamabad Interchange.
A comprehensive briefing encompassing the salient of construction zone, methodology to be adopted, equipment / human resource and dualization was given before start of work. It was highlighted that safety and security of the commuters and workforce were being accorded paramount importance besides ensuring uninterrupted flow of traffic causing minimum possible delay to the commuters. Traffic continuity will remain uninterrupted, and time management has also been given singular priority.
It is pertinent to mention here that the project will be completed in shortest possible time under a Build-Operate-Transfer (BOT) system that includes re-carpeting 337 km length, modernization of motorway facilities, repair and rehabilitation to enhance motorway life. Moreover, M2 has already been handed over to FWO for operation and maintenance for the next 20 years. Motorway was formally handed over to FWO by NHA on 15 Dec 2014 during an inaugural ceremony performed by Prime Minister Muhammad Nawaz Sharif.
Construction of road near Walton Station inaugurated
ISLAMABAD- Railways Minister Khawaja Saad Rafique has said that Government is taking all possible measures to overcome the shortage of petroleum products soon. Prime Minister has already suspended the concerned senior officers in this regard.
He was addressing the inauguration of work on a link road project in Lahore today. He said that Pakistan Railways has enough oil reserves for fourteen days, which will be increased up to thirty days with passage of time. He said that all possible measures are being taken for decreasing the losses and increasing the income of Pakistan Railways.
He said, green belt will be formed on both sides of rail track from Shahdara Lahore to Raiwand and all wastes will be removed from this area.
Railways Minister said that Baaba-e-Pakistan Project will be launched in Lahore this year, to pay homage to the migrants from India at the time of partition.
About the link road project, Khawaja Saad Rafique said that this one hundred million rupees project, will link area from Seven-up Railway Crossing to the Ferozepur Road in Lahore.
He said that this project will be completed within three months. Later, he inaugurated the work on the project.
At last, the final route to new airport link motorway via Top City.