Muhammad Omar
ELITE MEMBER
- Joined
- Feb 3, 2014
- Messages
- 13,558
- Reaction score
- 15
- Country
- Location
Sukkur-Multan Section
Approved by Executive Committee of the National Economic Council (ECNEC) today (03.07.2014):
(i) Construction of Sukkur-Multan section of Karachi-Lahore Motorway with rationalized cost of Rs. 259.353 billion.
Don't know if they will spend from PSDP or get a soft loan from china(as stated in NHA documents) for Sukkur-Multan section.
1. Section length is 387 km(Longest). And it will be completed by october 2017 (Sorce: PTV)
ISbd-Pindi Metro bus
New Islamabad Int. Airport
Approved by Executive Committee of the National Economic Council (ECNEC) today (03.07.2014):
(i) Construction of Sukkur-Multan section of Karachi-Lahore Motorway with rationalized cost of Rs. 259.353 billion.
Don't know if they will spend from PSDP or get a soft loan from china(as stated in NHA documents) for Sukkur-Multan section.
1. Section length is 387 km(Longest). And it will be completed by october 2017 (Sorce: PTV)
ISbd-Pindi Metro bus
New Islamabad Int. Airport